The new facility provides maintenance, repair and additional storage for the local rail transit system’s (GO Transit) planned service expansion.
East Rail Maintenance Facility
whitby, ontario


The new facility will include a single NHL-sized ice surface with more than 9,000 permanent seats and a reconfiguration design of 10,000 seats to accommodate other events.
Moncton Downtown Centre
moncton, new brunswick


Due to the rapid and continued growth in the RCMP E Division headquarters’ operations, Bird has constructed a consolidated headquarters - the largest RCMP Division headquarters in the country.
RCMP E DIVISION
SURREY, BRITISH COLUMBIA


As part of the Suncor Voyageur Upgrader, the new coker structure is home to six coke drums and is the largest coker structure in the world.
SUNCOR VOYAGEUR COKER
FORT MCMURRAY, ALBERTA


Consolidating Thunder Bay’s Superior Court of Justice and Ontario Court of Justice, the Thunder Bay Courthouse is a seven-storey building housing 15 courtrooms.
THUNDER BAY COURTHOUSE
THUNDER BAY, ONTARIO


The Wuskwatim project is a 200-megawatt run-of-river hydroelectric generating station developed on the Burntwood River at Taskinigup Falls.
WUSKWATIM GENERATING STATION
THOMPSON, MANITOBA


At 323,000 square feet, the Jim Pattison Outpatient Care and Surgery Centre delivers a sizable health care addition to this growing Vancouver suburb.
OUTPATIENT CARE & SURGERY CENTRE
SURREY, BRITISH COLUMBIA


H.J. O'Connell Limited (HJO), a division of Bird, is completing work at one of the main mining pits in the ArcelorMittal mine, Paul's Peak.
PAUL'S PEAK WASTE ROCK PROJECT
MT. WRIGHT, QUEBEC


The new face of the Ontario Veterinary College at Guelph University is the Pathobiology and Animal Health Laboratory Building, a 125,000 square foot four-floor building.
ONTARIO VETERINARY COLLEGE
GUELPH, ONTARIO


Morgan Crossing, labelled as the “anti-suburbs", is a mixed commercial and retail project spanning almost 600,000 square feet.
MORGAN CROSSING
SURREY, BRITISH COLUMBIA


Constructed from over one million square feet of stainless steel cladding, the Potash Product Storage Facility in Rocanville West is part of Potash Corporation's overall mine expansion project.
POTASH STORAGE FACILITY
ROCANVILLE, SASKATCHEWAN


With 140 beds and seven in-patient units, Restigouche Health Centre provides psychiatric care for New Brunswickers.
RESTIGOUCHE HEALTH CENTRE
CAMPBELLTON, NEW BRUNSWICK


A year-round sports and recreational facility, the Doug Mitchell Thunderbird Sports Centre served as an ice hockey venue at the 2010 Winter Olympics and Paralympic Games.
THUNDERBIRD SPORTS CENTRE
VANCOUVER, BRITISH COLUMBIA


Reclaiming the wastewater of Fort McMurray and returning it to the environment with improved effluent quality is the purpose of the new waste water reclamation facility.
WOOD BUFFALO WASTEWATER PLANT
FORT MCMURRAY, ALBERTA


The Pembina Hall residence project featured the construction of a 15-storey building around and above the existing two-storey dining facility.
PEMBINA HALL RESIDENCE
WINNIPEG, MANITOBA


The new emergency operations centre houses the City of Calgary’s disaster services unit and a new state-of-the-art operations room.
EMERGENCY OPERATIONS CONTROL CENTRE
CALGARY, ALBERTA


The Canadian Blood Services’ Atlantic Production Facility is a consolidated facility which is the centre for management of the supply of blood and blood products in Atlantic Canada.
CANADIAN BLOOD SERVICES PRODUCTION FACILITY
DARTMOUTH, NOVA SCOTIA


As Canada’s first lifestyle centre, the Village at Park Royal evokes images of the turn of the century fishing villages that dotted the shores of British Columbia.
VILLAGE AT PARK ROYAL
VANCOUVER, BRITISH COLUMBIA


The Milestone Corporate Centre is a four-storey office building that was delivered on schedule and on budget despite construction challenges.
Milestone Corporate Centre
TORONTO, ONTARIO


Bird consolidated 16 buildings, widely dispersed over 25 hectares of land, for Canadian Forces, civilian employees and reservists working at the current Pleasantville site.
Pleasantville Consolidation Project
ST.JOHN’S, NEWFOUNDLAND & LABRADOR


At the heart of the Banff Centre is the Kinnear Centre for Creativity and Innovation featuring classroom, performance, meeting and learning spaces.
KINNEAR CENTRE
BANFF, ALBERTA


With 18 facilities in 16 communities, the Ontario Provincial Police Modernization project consists of three unique building types: detachments, regional command centres and forensic identification units.
OPP MODERNIZATION
16 COMMUNITIES THROUGHOUT ONTARIO


One of the most industrious projects undertaken in the province of New Brunswick, Potash Corporation's vast Picadilly deposit has demanded the skills of Bird at numerous sites.
PICADILLY POTASH SITES
PENOBSQUIS & SUSSEX, NEW BRUNSWICK


Located 50-miles north of Fort McMurray, the Shell Albian Sands, Muskeg River Mine (MRM) extracts bitumen from northern Alberta's large oilsands deposit.
SHELL Muskeg River Mine SERVICES BUILDING
FORT MCMURRAY, ALBERTA


The Suncor Firebag 3 Village Camp includes a core building and residential facilities, site services, parking and landscaping on a 50 acre site.
SUNCOR FIREBAG CAMP CORE
FORT MCMURRAY, ALBERTA


The Syncrude UE-1 CC131 foundation for Syncrude's plant operations at the Fort McMurray oilsands facility represents a major expansion for Syncrude.
SYNCRUDE UE-1 UPGRADER EXPANSION
FORT MCMURRAY, ALBERTA


Voisey's Bay civil works included over 7.8 million cubic yards of material excavation, 2.6 million cubic yards of rock excavation, and 12 miles of main mine haul road and access roads.
VOISEY'S BAY CIVIL WORKS
VOISEY'S BAY, NEWFOUNDLAND & LABRADOR


The new student union building for University of British Columbia is a five-storey facility with two underground levels connecting to the former existing student union building.
The AMS Student Nest at University of BC
VANCOUVER, BRITISH COLUMBIA


With a building footprint of over four hectares, the centre is comprised of a mail processing plant and a two-storey office space.
Canada Post Pacific Processing Centre
RICHMOND, BRITISH COLUMBIA


The 90-bedroom Tideview Terrace Nursing Home is among the few nursing homes on the east coast that are designed and constructed with green building principles.
TIDEVIEW TERRACE NURSING HOME
DIGBY, NOVA SCOTIA


With a total number of 280 hotel rooms in each of the two 15-storey towers, the new towers add to a vibrant downtown core and positively impact the surrounding area.
Hampton Inn & Homewood Suites
HALIFAX, NOVA SCOTIA


As a new approach to build schools in Alberta, Bird delivered 18 schools across Calgary and Edmonton in a relatively short time frame under the public-private partnership building model.
ASAP I
CALGARY & EDMONTON, ALBERTA


The second Alberta Schools Alternative Procurement project delivered through the public-private partnership building model includes 10 schools for Calgary, Edmonton, Langdon and Okotoks.
ASAP II
CALGARY & EDMONTON, ALBERTA


Located in the Simon Fraser University’s Arts and Social Sciences Complex, Saywell Hall and Blusson Hall were completed by Bird in two phases.
Simon Fraser University SAYWELL & BLUSSON HALL
BURNABY, BRITISH COLUMBIA


With over 100 projects completed for Walmart across Canada, Bird understands the compressed schedules and changing requirements that accompany projects in the urban market.
WALMART PORTFOLIO
VARIOUS LOCATIONS ACROSS CANADA


BMW’s first vertical showroom in North America and the largest of its kind in Canada consisted of retrofitting a six-storey office building into a showroom dealership.
BMW TORONTO DEALERSHIP
TORONTO, ONTARIO


The Maintenance Hangar No. 1 for 8 Wing Canadian Forces Base Trenton is built to accommodate the new CC-177 Globemaster III jets - one of the largest aircrafts in the world.
8 WING MAINTENANCE HANGAR NO.1
TRENTON, ONTARIO


The Elementary Teachers' Federation of Ontario (ETFO) has set a benchmark in sustainable design with its new completed headquarters.
ELEMENTARY TEACHERS’ HEADQUARTERS
TORONTO, ONTARIO


The new Maple Leaf foods Processing Plant is one of the most advanced food processing plants in North America.
Maple Leaf Foods Processing Plant
HAMILTON, ONTARIO


A dramatic sweeping roof and canopy marks the Canadian Plaza at the Peace Bridge, sheltering the activities of the central customs and immigration building beneath.
Canadian Plaza at the Peace Bridge
FORT ERIE, ONTARIO


Bird built five mine services facilities buildings within the crushing and conveying area of the Jackpine expansion including the mine services complex, ore prep operations building, vehicle shop, tire shop and cold/warming shed.
SHELL JACKPINE MINE MAINTENANCE FACILITIES
FORT MCMURRAY, ALBERTA


With more than 50 per cent of the building's structure constructed with wood material, the University of British Columbia's Earth Science Building is one of the largest wood structures in North America.
UBC's Earth Science Building
VANCOUVER, BRITISH COLUMBIA


The Brock University project involves the adaptive re-use of a former 19th century textile mill on St. Paul Street, the Canada Hair Cloth building and a renovation to the adjacent warehouse space.
Brock University's Marilyn I. Walker School
St. Catharines, Ontario


HJO, a subsidiary of Bird, completed the overburden and rock excavation of the intake, powerhouse, spillway, and converter stations and dams at the site.
MUSKRAT FALLS GENERATING STATION
HAPPY VALLEY-GOOSE BAY, NEWFOUNDLAND AND LABRADOR


Bird is completing the piling, foundations, earthworks, underground piping and electrical systems for the ore preparation plant (OPP) and the extraction and tailings plant (E&T).
Fort Hills Civil Works
Fort McMurray, Alberta


Bird, in collaboration with its subsidiary, Nason, is completing work at two locations as part of Enbridge Pipelines (Athabasca) Inc.’s JACOS Pipeline project.
Enbridge Pipeline Project
approximately 75 km south of fort mcmurray, alberta


The civil earthworks portion included site grading and associated work for the new substation
Soldiers Pond Civil Earthworks
soldiers pond, newfoundland and labrador


As the first Cabela’s retail store in Atlantic Canada, the facility features exposed glulam beams, cultured stone and Cabela’s custom colour aluminum framing and glazing.
Cabela’s Retail Store
moncton, new brunswick


The new hospital is located on the same site as the current facility. It will include a floor area of over 27,270 square metres with 105 inpatient beds.
Stanton Territorial Hospital Renewal
yellowknife, northwest territories


The team is dedicated to working with the province to deliver the 18 schools on nine sites in Saskatchewan by 2017.
Saskatchewan Joint-Use Schools Project
saskatoon, regina, warman and martensville, saskatchewan


The Kip District will take the form of a multi-building complex with both residential and retail uses located around a town square within the site.
The Kip District: One
etobicoke, ontario


Faced with regional factors such as extreme cold, sparse population, unique scheduling, logistical challenges and a four month winter shutdown, Bird completed the design and construction of the new Hay River Health Centre
Hay River Health Centre
Hay River, Northwest Territories


88 Scott will create a bold vision for an exceptional new landmark condominium in one of the city’s premier downtown locations.
88 Scott Condominiums
TORONTO, ONTARIO


Canon's new Canadian corporate headquarters is a cast-in-place concrete structure wrapped in a silvery-white curtainwall with vertical fins of fritted glass as it appears to float above its recessed base of black granite.
Canon Canada Headquarters
Brampton, Ontario


The new Natoaganeg School is a kindergarten to grade 8 school that can accommodate more than 125 students.
Natoaganeg School
Miramichi, New Brunswick


The plant is able to produce 18 million litres of fresh water per day — more than doubling the previous capacity.
Drayton Valley Water Treatment Plant
Drayton Valley, Alberta


The facility features state-of-the-art council chambers, offices and a data centre for the town’s operations.
Camrose City Hall
camrose, alberta


The Seven Oaks Arena is a new twin pad NHL-sized ice hockey arena equipped with a raised 350-seat spectator concourse in each arena, equipment storage areas, change rooms and a club room suite.
Seven Oaks Arena
winnipeg, manitoba


Bird has completed two projects for Dalhousie University: CHEB and WMLC.
Collaborative Health Education Building & Wallace McCain Learning Commons
halifax, nova scotia


Scope included a 4,370-cubic-m below ground water storage reservoir and 1,750-sq-m water treatment plant with a capacity of 150-litres per second.
Headingley Water Treatment Plant
headingley, manitoba


The Casey House Redevelopment project is a four-storey addition to a heritage-designated Victorian mansion on Jarvis St. in Toronto.
Casey House AIDS Hospice Redevelopment
toronto, ontario


Due to the increase of construction activities in the area, there was a growing demand for potable water consumption in construction camps.
Anzac Water Reservoir & Pump Station
anzac, alberta


Etobicoke General Hospital is undergoing significant revitalization to meet the growing demands of its community.
Etobicoke General Hospital Ancillary Services Building
toronto, ontario


The new performing arts facility is comprised of four state-of-the-art performance venues for music, theatre, dance and film.
FirstOntario Performing Arts Centre
St. Catharines, Ontario


The 18-storey residential tower is complete with gym facilities and retail spaces on the ground floor.
Brunswick Heights Apartments
HALIFAX, NOVA SCOTIA


Since 2006, les Entreprises de Construction de Québec (LECQ), a division of Bird, has been continuously operating the Fire Lake iron ore mine for ArcelorMittal.
Fire Lake Mining
Fire Lake, Quebec


The South Operations Centre provides an office building, fleet storage space and fleet maintenance shops.
Regional Municipality of Wood Buffalo South Operations Centre
Fort McMurray, Alberta


The building will house specialized facilities for biology, chemistry, physics, astronomy, nursing, kinesiology and computing science labs.
Langara College Science & Technology Building
Vancouver, British Columbia


As the second largest correctional facility in the province, the new Pictou County penitentiary has the capacity to hold up to 196 offenders.
Northeast Correctional Facility
priestville, nova scotia


The NRRRC aquatic centre is an addition to the 30,500-square-metre complex built by Bird in 2011.
Northern Rockies Regional Recreation Centre Aquatic Centre
fort nelson, british columbia


Serving six northwest communities under one roof is the new Royal Vista Multi-Service Facility and Fire Station 34.
Royal Vista Multi-Service Facility & Fire Station 34
calgary, alberta


Self-performed works: concrete pump house structure, pipe fabrication & electrical & instrumentation scope.
ATCO Brine & Sedimentation Ponds & Pump Houses
strathcona county, alberta


Pro Cycle, a motorcycle dealership, was built by Bird using 26 tilt-up concrete panels, each 25 feet high and weighing an average of 35 tons.
Pro Cycle
dartmouth, nova scotia


The new terminal features two car dealerships on the same lot, a 1,585-square-metre facility for Audi and 2,930-square metre two-storey Volkswagen facility.
Volkswagen & Audi Terminal
dieppe, new brunswick


Each electrode site location will be connected to a converter station at Muskrat Falls and Soldiers Pond respectively, as part of the Muskrat Falls hydroelectric project.
Electrode Sites
southern labrador & conception bay south, newfoundland & labrador


As the first project completed by Bird for Memorial University (MUN), the team has completed a major renovation to the existing St. John’s College building on the MUN campus.
St. John’s College Upgrades
st. john’s, newfoundland & labrador


Bird is part of the consortium, ATCO Two Rivers Lodging Group, which will design, build, partial finance, operate and maintain the worker accommodation lodge at the Site C hydroelectric dam site for BC Hydro.
Site C Worker Accommodation
fort st. john, british columbia


The West End Water Pollution Control Centre project included new construction and renovations to the existing sewage treatment facility.
WATER POLLUTION CONTROL CENTRE
WINNIPEG, MANITOBA


As the architectural focal point for the Scotford upgrader Expansion One site, the Control Administration, Security and Operators Satellite Building is Shell Canada's nerve centre for the entire upgrader.
SHELL Security / Admin / Control Building
FORT SASKATCHEWAN, ALBERTA


Situated on a coal mine, the Highvale Maintenance Shop includes three shop maintenance areas, a wash bay, sump and mezzanine.
HIGHVALE MINE TRUCK SHOP
DUFFIELD, ALBERTA


The high voltage test facility for Manitoba Hydro is one of only three high voltage test facilities in Canada capable of assessing 550-kilovolt alternating and 500-kilowatt direct current equipment.
HIGH VOLTAGE TEST FACILITY
WINNIPEG, MANITOBA


The Suncor Firebag 3 administration buildings is a unique project that locates the administration and control buildings in a remote site and are the first LEED certified buildings designed and constructed in the oilsands.
SUNCOR FIREBAG BUILDINGS
FORT MCMURRAY, ALBERTA


The scope of work included the mill site building, coarse ore storage building, crusher, powerhouse, accommodation complex, site wide storage facility and port site works.
VOISEY'S BAY SITE WIDE CONCRETE
VOISEY'S BAY, NEWFOUNDLAND & LABRADOR


A world leader in the field of light activated pharmaceuticals, QLT Phototherapeutics required additional space to accommodate their explosive growth.
QLT Phototherapeutics OFFICE
Vancouver, British Columbia


The Matsqui Institution project included two phases to expand and renovate the penitentiary.
Matsqui Institution EXPANSION & RENOVATION
Abbotsford, British Columbia


As the first hotel in Canada to be built directly connecting to a hospital, the Canad Inns Destination Centre provides welcome accommodations for Health Sciences Centre patients and their families.
CANAD INNS DESTINATION CENTRE
WINNIPEG, MANITOBA


The over 100-year-old Misericordia Health Centre required tactical coordination to demolish and replace portions of the multi-building medical campus on a confined site as the hospital remained operational.
MISERICORDIA HEALTH CENTRE
WINNIPEG, MANITOBA


Genesis Place Recreation & Wellness Centre features indoor soccer fields and basketball courts, a gymnastic area, a running tack and workout facilities.
GENESIS PLACE RECREATION
AIRDRIE, ALBERTA


Bird has completed the construction of five new buildings to upgrade the Kingsgate border crossing operations.
KINGSGATE BORDER CROSSING
KINGSGATE, BRITISH COLUMBIA


Phase 3 of Genesis Place concludes the final phase to the existing recreation centre in Airdrie. The project consists of two NHL-sized hockey rinks, a refrigeration plant and ice resurfacer room.
GENESIS PLACE PHASE III
AIRDRIE, ALBERTA


The Sweetgrass Coutts Border Crossing is a shared border crossing facility for Canada and the United States.
SWEETGRASS COUTTS BORDER CROSSING
COUTTS, ALBERTA


The Alberta government commissioned the renovation and refurbishing of the auditoria in time for their grand re-opening at Alberta’s Centennial celebrations.
JUBILEE AUDITORIA
CALGARY & EDMONTON, ALBERTA


The Athabasca Chipewyan First Nations Corporation project includes two buildings: an office building and a vehicle maintenance facility.
ACDEN HEADQUARTERS & FLEET FACILITY
FORT MCMURRAY, ALBERTA


The new Boilermakers Training Facility is the most advanced training and education centre for pipefitters and boilermakers in North America.
BOILERMAKERS TRAINING FACILITY
EDMONTON, ALBERTA


The Kitimat General Hospital & Health Centre is a full-service hospital and health centre consisting of acute, long-term care, clinics and mental health facilities.
KITIMAT HOSPITAL
KITIMAT, BRITISH COLUMBIA


The Nanaimo Regional Hospital Acute expansion included four elevators, and additional operation and recovery rooms to the seven-storey building.
NANAIMO HOSPITAL ACUTE EXPANSION
NANAIMO, BRITISH COLUMBIA


The Aquatic Ecosystems Research Laboratory (AERL) at the University of British Columbia is a four-storey laboratory constructed to bring together three existing research groups under one roof.
AQUATIC ECOSYSTEMS RESEARCH LAB
VANCOUVER, BRITISH COLUMBIA


The Vancouver Transit Centre houses the second largest and most advanced trolley fleet in North America.
VANCOUVER TRANSIT CENTRE
VANCOUVER, BRITISH COLUMBIA


The Simon Fraser University’s Surrey Campus is upgraded with research labs, lecture theatres, classrooms, a library and offices.
SIMON FRASER UNIVERSITY SURREY CAMPUS
SURREY, BRITISH COLUMBIA


The new three-storey building for Langara College houses library collections, service areas and study spaces, in addition to classrooms, computer labs and offices.
LANGARA COLLEGE LIBRARY
VANCOUVER, BRITISH COLUMBIA


With its large floor plate, simple column layout and cantilevers providing a column-free perimeter zone, Bird upgraded the interior of the two-storey Surrey Tax Centre.
SURREY TAX CENTRE
SURREY, BRITISH COLUMBIA


A practice facility for the 2010 Winter Olympic Games, the Trout Lake Arena includes an international-sized ice rink complete with spectator seating, skaters lounge, change rooms and facility support areas.
TROUT LAKE ARENA
VANCOUVER, BRITISH COLUMBIA


The SkyTrain Operations and Maintenance Centre includes offices, storage facilities, a maintenance shop and the SkyTrain vehicle run.
SKYTRAIN OPERATIONS & MAINTENANCE CENTRE
BURNABY, BRITISH COLUMBIA


The Chilliwack Hospital was in need of an expansion and upgrades due to the growing population. Bird built an emergency room, a medical lab building and completed phased renovations.
CHILLIWACK HOSPITAL
CHILLIWACK, BRITISH COLUMBIA


The new clinical support building for the Children’s and Women’s Health Centre is part of phase one of the redevelopment of the health centre.
CLINICAL SUPPORT BUILDING
VANCOUVER, BRITISH COLUMBIA


Due to an increased need for long-term care facilities in Nova Scotia, Bird was contracted to build three new facilities in Amherst, Bible Hill and Bridgewater.
SHANNEX HEALTH CARE FACILITIES
VARIOUS LOCATIONS, NOVA SCOTIA


The Pictou County Wellness Centre supports the sport, health and wellness, business, educational and social needs of the residents of Pictou County.
PICTOU COUNTY WELLNESS CENTRE
PICTOU, NOVA SCOTIA


Delivered under the public-private partnership building model, the Eleanor W. Graham Middle School and Northrop Frye School are unlike any other educational facility in the province.
MONCTON-REXTON SCHOOLS
MONCTON & REXTON, NEW BRUNSWICK


The new campus-style facility, Roy McMurtry Youth Centre, offers a safe, secure and healthy rehabilitative living environment for youth in conflict with the law.
Roy McMurtry Youth Centre
BRAMPTON, ONTARIO


Bird has successfully completed two projects on Sheridan College's Davis Campus including the Centre for Social Innovation and Davis Welcome Centre.
SHERIDAN COLLEGE DAVIS CAMPUS
BRAMPTON, ONTARIO


The Loch Lomond Villa Nursing Home is an 100-bed facility addressing the population’s increased number of seniors requiring housing and care.
Loch Lomond Villa Nursing Home
SAINT JOHN, NEW BRUNSWICK


By presenting the winning redevelopment solution to Children’s Aid Society for the Child Welfare Centre, Bird was the successful proponent amongst a national competition.
CHILD WELFARE CENTRE
TORONTO, ONTARIO


The Saint John Law Courts is a six-storey facility housing 13 courtrooms, a barristers’ lounge, office space for the judiciary, court services, public prosecutors, sheriff services and the Department of Public Safety and Policing.
Saint John Law Courts
SAINT JOHN, NEW BRUNSWICK


The expansion project for 12 Wing Shearwater’s Maritime Helicopter Support Facilities includes three new buildings and facility upgrades.
12 WING HELICOPTER FACILITIES
DARTMOUTH, NOVA SCOTIA


Fifth in the series of successful projects completed by Bird at St. Francis Xavier, the Gerald Schwartz School of Business adds another jewel to the historic campus.
ST. FX SCHOOL OF BUSINESS
ANTIGONISH, NOVA SCOTIA


Constructed in several phases, Viva Magnetics specializes in automated plastics injection manufacturing processes.
VIVA MAGNETICS PLANT
SCARBOROUGH, ONTARIO


As one of the first housing co-operatives to be built in 20 years, 60 Richmond Street East Co-operative Housing is an example of urban infill and sustainability in Toronto.
60 RICHMOND STREET HOUSING
TORONTO, ONTARIO


The 70,000 square foot Alderwood Rest Home nursing facility contains three different levels of care and houses 70 residents in two wings.
ALDERWOOD REST HOME
BADDECK, NOVA SCOTIA


Under a tight budget, Bird successfully delivered the Greyhound Bus Terminal within budget by offering a substantial cost savings on the exterior envelope.
GREYHOUND BUS TERMINAL
WINNIPEG, MANITOBA


The LEED Gold certified McMaster Engineering Technology Building is a six-storey academic and research facility.
MCMASTER ENGINEERING TECHNOLOGY
HAMILTON, ONTARIO


The much anticipated Northern Rockies Regional Recreational Centre is a new community centre and 800-seat arena for the community of Fort Nelson.
ROCKIES RECREATIONAL CENTRE
FORT NELSON, BRITISH COLUMBIA


As the commercial hub of the area, the Centre of Newton comprises six buildings including Save-On Foods, Shoppers Drug Mart, Tim Hortons, Envision Credit Union and others.
CENTRE OF NEWTON
SURREY, BRITISH COLUMBIA


The largest of its kind in British Columbia, the Village at Grandview Corners is an unenclosed retail development project.
VILLAGE AT GRANDVIEW CORNERS
SURREY, BRITISH COLUMBIA


Broadway Tech Centre is a 17-acre urban business campus designed for tenants seeking an exceptional working environment for their employees.
BROADWAY TECHNOLOGY CENTRE
VANCOUVER, BRITISH COLUMBIA


The Fraser Downs Gaming Centre, an active racetrack, was renovated and expanded in three phases to allow continued operations of the centre.
Fraser Downs Gaming Centre
SURREY, BRITISH COLUMBIA


The Sawridge Inn and Conference Centre renovation was completed in phases in order to maintain the full operation of the hotel.
Sawridge Inn & Conference Centre
FORT MCMURRAY, ALBERTA


A 13-storey luxury residential condominium, the Thornwood Residences Phase II features large suites with breathtaking views of Toronto from the exclusive Rosedale area.
THORNWOOD CONDOMINIUMS PH. 2
TORONTO, ONTARIO


Elevating the typical utilitarian aesthetic of municipal operations centres, the elegant Newmarket Operations Centre has garnered plenty of attention.
Newmarket Operations Centre
NEWMARKET, ONTARIO


Marked by elegance, Europa at International Village is a 268,000 square foot enclosed retail space with a 27-storey condominium residence and several townhouses.
Europa at International Village
VANCOUVER, BRITISH COLUMBIA


The Berczy is a lavish collection of 166 condominium units in a terraced 13-storey residential property located in Toronto’s fashionable St. Lawrence neighbourhood.
The Berczy Condominiums
TORONTO, ONTARIO


The new electrical and mechanical equipment facility for 8 Wing Trenton provides a central maintenance and storage facility for 750 licensed vehicles and over 1,200 pieces of maintenance equipment.
8 WING ELECTRICAL & MECHANICAL FACILITY
TRENTON, ONTARIO


As the inaugural building for the Mississauga campus of Sheridan College, the Hazel McCallion Campus establishes a cornerstone for the college.
SHERIDAN COLLEGE HAZEL CAMPUS
MISSISSAUGA, ONTARIO


The Burlington Performing Arts Centre is the first stand-alone, LEED-certified performing arts centre in Ontario.
Burlington Performing Arts Centre
BURLINGTON, ONTARIO


Osgoode Hall Law School, a heritage building located on the campus of York University, has undergone renovations and an addition to accommodate the students and faculty.
Osgoode Hall Law School
TORONTO, ONTARIO


The three-storey Kwantlen University Surrey Main expansion adds seminars rooms, midsize classrooms, a study area, computer labs and other enhanced student services.
KWANTLEN UNIVERSITY SURREY MAIN
SURREY, BRITISH COLUMBIA


This LEED Silver facility consolidates all of the departments of the Winnipeg Humane Society under one roof.
Winnipeg Humane Society
WINNIPEG, MANITOBA


Excavation, backfill and concrete placement services for two buildings was completed at Vale’s Long Harbour Processing Plant.
Long Harbour Processing Plant Site
LONG HARBOUR, NEWFOUNDLAND & LABRADOR


The Neepawa Wastewater Treatment Facility utilizes innovative technology including a reverse osmosis filtration system that improves effluent discharge quality and provides a new source for clean non-potable water.
Neepawa Wastewater Treatment Facility
NEEPAWA, MANITOBA


Working within an operating plant, Petro Canada RCP 1.1 civil works included concrete foundations and paving work and related earthwork in the coker unit, the crude/vac unit, utility and offsites, and revamp areas.
Petro Canada RCP 1.1 Civil Works
EDMONTON, ALBERTA


To accommodate the increasing population in the Regional Municipality of Wood Buffalo, Bird bid and secured all four phases to upgrade the municipality’s water treatment plant.
Wood Buffalo Water Treatment Expansion
FORT MCMURRAY, ALBERTA


As the construction manager for the central core building for Devon’s Jackfish District Camp facilities, Bird also completed site work and utilities.
DEVON'S JACKFISH DISTRICT CAMP
CONKLIN, ALBERTA


Over 10,500 cubic yards of concrete was placed for the general civil works package at the Kirby In-Situ Oilsands Project located in northern Alberta.
KIRBY IN-SITU OILSANDS CIVIL WORKS
FORT MCMURRAY, ALBERTA


HJOC completed the residue storage area and dams project at Vale's Long Harbour Nickel Processing Plant, which included three earth filled dams encapsulating the residue storage area.
Residue Storage Area and Dams
Long Harbour, Newfoundland & Labrador


As one of first contractors on the client's site, Bird completed a 100-metre-high communication tower, communication systems building and a 100-kilowatt temporary power system.
Communication Tower
Fort McMurray, Alberta


Originally built in the early 1970s, Bird renovated and expanded the Kennebecasis Library. Bird longevity on the east coast lent itself to the project's success as the team was able to provide the best possible facility to the client and community.
Kennebecasis Library
Quispamsis, New Brunswick


As the world’s largest Caterpillar equipment dealer, Finning contracted Bird to complete an expansion to the existing repair shop, storage warehouse and two-storey office building at their Fort Nelson Finning location.
Finning Facility Expansion
Fort Nelson, British Columbia


The new residences at St. Francis Xavier University have been designed in-house by Bird's design team using building information modeling (BIM) 3D software.
St. FX University Residences
Antigonish, Nova Scotia


The Co-op Refinery Complex, the world's first co-operatively-owned refinery supplies local co-operative associations with quality petroleum products.
CCRL General Civil Works
Regina, Saskatchewan


A combination of new construction and upgrades, Bird entered a design-assist contract with the client to complete the student union building and C building.
LANGARA COLLEGE SUB
VANCOUVER, BRITISH COLUMBIA


Bird has successfully completed the second building in the city’s proposed four district renewal model to consolidate the former six district configuration to replace outdated facilities.
Winnipeg Police Service West District Station
Winnipeg, Manitoba


Bird is working with Enbridge to increase the Alberta Clipper Pipeline capacity from 450,000 barrels-per-day to 800,000 bpd of heavy crude oil by increasing pumping horsepower.
Enbridge Clipper Expansion
multiple locations across alberta, saskatchewan & manitoba


To accommodate the new oncology unit at the Moncton Hospital, Bird completed the construction of a new wing in place of the former laboratory and X-ray wings.
Moncton Hospital’s Oncology Clinic
Moncton, New Brunswick


The Quarry Park Recreation Facility is located in a former industrial area that is being transformed into an office park and residential community.
Quarry Park Recreation & Wellness Centre
Calgary, Alberta


Wing Kei Greenview is a 95-bed senior supportive living centre featuring a three-storey greenhouse mezzanine and chapel.
Wing Kei Greenview Senior Supportive Living Centre
Calgary, Alberta


The new centre will provide an establishment where local culture, language, traditions, stories and experiences will be shared and celebrated by the Labrador Inuit.
Illusuak Cultural Centre
Nain, Newfoundland & Labrador


Bird is the construction manager for Civeo Premium Camp Services 2,200-person Sitka Lodge camp project.
Kitimat Sitka Lodge
Kitimat, British Columbia


The Boulevard Club west wing replacement project is a new two-storey addition to the historic Boulevard Club on Toronto’s western waterfront.
The Boulevard Club West Wing Replacement
Toronto, Ontario


Bird provided pre-construction services and completed all civil works including the installation of underground utilities and a large precast concrete sump.
Air Products Hydrogen Plant Civil Construction
fort saskatchewan, alberta


After nearly 25 years of vacancy and neglect, the historic Metropolitan Theatre originally constructed in 1919 is being repurposed.
METROPOLITAN THEATRE
WINNIPEG, MANITOBA


The Lunenburg County Lifestyle Centre is an aquatic centre with three pools, one NHL-sized ice surface with a 1,200 seating capacity, a public library and an active living space.
LUNENBURG COUNTY LIFESTYLE CENTRE
LUNENBURG, NOVA SCOTIA


Located in the heart of downtown Toronto, Bird has completed the Fairmont Royal York floor renovations including two floors of accommodation suites, as well as constructing luxury gold suites.
Fairmont Royal York Renovations
Toronto, Ontario


The project was procured through an in-house design-build approach, where Bird’s internal design team worked closely with the client to develop a functional space program, and prepare conceptual and design development drawings.
NS Government Union Headquarters
Dartmouth, Nova Scotia


H.J. O’Connell, a division of Bird, is the lead in a joint venture with Vancouver Pile Driving Ltd. in the construction of the new vertical lift bridge in Placentia.
Sir Ambrose Shea Lift Bridge
Placentia, Newfoundland and Labrador


The Nanuk Community Centre is a new facility providing various functions and recreational programs to support the Hopedale Inuit community.
Nanuk Community Centre
Hopedale, Newfoundland & Labrador


Mission Institution is a medium security federal institution within the Correctional Service of Canada. Bird completed the new 3,200 square metre, 96-bed two-storey addition.
Mission Institution
Mission, British Columbia


Sobeys Sage Creek is the first in a series of new Sobeys stores to be launched across the country.
SOBEYS SAGE CREEK
WINNIPEG, MANITOBA


Having proven our capabilities to the City of Calgary in the past, Bird was contracted by the municipality to complete the Talisman Recreation Centre repairs in the most efficient way to reopen the facility as quickly as possible.
Talisman Recreation Centre Repairs
Calgary, Alberta


Bird completed the multi-phase renovations to the 9th and 12th floors in the City of Calgary’s municipal building.
City of Calgary Municipal Building
Calgary, Alberta


This facility houses numerous Winnipeg Regional Health Authority departments under one roof that provide specialized services for handicapped children and youth
Special Services for Children and Youth
Winnipeg, Manitoba


The Beeton hydroelectric development involved excavation, primary and secondary concrete pouring, and supply and installation of equipment.
BEETON HYDROELECTRIC DEVELOPMENT
GRAND FALLS, NEWFOUNDLAND & LABRADOR


The Genesee III foundations scope of work included underground piping, excavation and concrete foundations.
GENESEE III FOUNDATIONS
WARBURG, ALBERTA


Through value engineering and project management, the rehabilitation of an existing powerhouse for Abitibi Consolidated was successfully completed.
POWERHOUSE REHABILITATION
IROQUOIS FALLS, ONTARIO


The Voisey's Bay Dock Project consisted of the installation of six 80 foot flat web steel sheet pile cells with four 20 foot interconnecting arcs.
VOISEY'S BAY DOCK PROJECT
VOISEY'S BAY, NEWFOUNDLAND & LABRADOR


The Minacs Worldwide Inc. Canadian Headquarters is a state-of-the-art multi-media contact centre and the principle site for the company’s research and development.
Minacs Headquarters
Oshawa, Ontario


The Stiller Centre for Biotechnology Commercialization provides physical space and a range of management and technical support for 30 new biotechnology firms in the life sciences sector.
The Stiller Centre
London, Ontario


The Toronto Pearson International Airport project was comprised of building bridges, corridors and walkways for piers D & E in the new terminal one.
TORONTO AIRPORT BRIDGES
Toronto, Ontario


The United Mennonite Home is the first design-build long-term care facility approved by the Ontario Ministry of Health and Long-term Care.
United Mennonite Home
Vineland, Ontario


The Stony Mountain Institute Unit Management and Cell Expansion included a four-storey addition, a new library and a complete renovation.
STONY MOUNTAIN INSTITUTE
Stony Mountain, Manitoba


An official heritage site, the Brandon Courthouse project was comprised of a new three level addition to the existing facility. Restoration of the old court building concluded the project.
Brandon Courthouse
Brandon, Manitoba


The Centre for the Commercialization of Biomedical Technology is a four-storey research facility housing 21 new wet and dry labs and an administration area.
Biomedical Technology CENTRE
Winnipeg, Manitoba


The Borealis Lodge Accommodation Complex is a 1,500 suite camp facility adjacent to a Suncor Energy Inc. oilsands development.
Borealis Lodge
Fort McMurray, Alberta


As the contractor for the original mine services complex at Suncor’s Steepbank Mine, Bird was subsequently awarded the contract to expand the wash bay, heavy vehicle maintenance shop and the mine dry area.
SUNCOR STEEPBANK MINE COMPLEX EXPANSION
Fort McMurray, Alberta


The Inex Pharmaceuticals Corporation is a research facility including laboratories, offices, process rooms and workstation areas.
Inex Pharmaceuticals Corporation
Burnaby, British Columbia


Producing bread for British Columbia’s lower mainland, Venice Bakery is located in Langley, BC.
Venice Bakery
Langley, British Columbia


A newly expanded and modernized Westman Regional Laboratory includes the latest technology for diagnostic testing.
WESTMAN LABORATORY
BRANDON, MANITOBA


The Brandon Fire & Emergency Services facility consists of a five bay, two-storey fire station, with office and administrative space, vehicle storage and hose tower.
BRANDON FIRE & EMERGENCY
BRANDON, MANITOBA


As the first aboriginal personal care home to be built in Winnipeg, the Southeast Personal Care Home is a single storey, 80-bed facility.
SOUTHEAST CARE HOME
WINNIPEG, MANITOBA


The University of Manitoba’s biological sciences building houses modern and advanced undergraduate laboratories, providing students with the access to leading-edge technology.
BIOLOGICAL SCIENCE BUILDING
WINNIPEG, MANITOBA


The South Fish Creek Recreation Complex includes a senior Catholic high school, a public library, twin ice arena, community gymnasium, public education space and YMCA.
SOUTH FISH CREEK RECREATION COMPLEX
CALGARY, ALBERTA


The King’s Heights Fire Station is designed as a prototype for emergency services facilities in Airdrie and forms the basis of design for the Airdrie Main Fire Hall.
KING'S HEIGHTS FIRE STN.
AIRDRIE, ALBERTA


Heartland Retirement Residence is a four-storey retirement residence that provides a full-service lifestyle with independent living.
HEARTLAND RETIREMENT RESIDENCE
OKOTOKS, ALBERTA


The Airdrie Main Fire Hall ensures the provision of emergency services to over 30,000 Airdrie residents and 2,000 rural residents covering an area of 550 square kilometres.
AIRDRIE MAIN FIRE HALL
AIRDRIE, ALBERTA


Bird completed the transformation of the Capri Centre Hotel to the Sheraton Hotel Starwood brand.
SHERATON HOTEL
RED DEER, ALBERTA


Aspen lodge is a four-storey seniors lodge, which includes 135 individual units in two wings.
ASPEN LODGE
CALGARY, ALBERTA


The Wing Kei Care Centre is a five-storey, 113-bed senior care facility with one level of underground parking.
WING KEI CARE CENTRE
CALGARY, ALBERTA


This unique Avatamsaka Monastery project included the addition of two levels to the existing single storey structure.
AVATAMSAKA MONASTERY
CALGARY, ALBERTA


Saddletowne Shops required a full range of site work in addition to building construction for a four-unit retail development.
SADDLETOWNE SHOPS
CALGARY, ALBERTA


The Nose Creek Elementary School accommodates close to 1,000 students and teachers.
NOSE CREEK SCHOOL
WEST AIRDRIE, ALBERTA


Bird created a 10,000 square foot addition and an 80,000 square foot renovation within an operational Leon’s Furniture retail and warehouse facility.
LEON’S FURNITURE
CALGARY, ALBERTA


The expansion to the existing Museum of the Regiments created a unique facility with greater public visibility.
MUSEUM OF THE REGIMENTS
CALGARY, ALBERTA


The Saville Sports Centre, a multi-sport facility at the University of Alberta, houses 10 curling sheets, eight indoor tennis courts and a multi-purpose gymnasium.
SAVILLE SPORTS CENTRE
EDMONTON, ALBERTA


The University of Northern British Columbia’s Teaching and Learning Centre accommodates 460 students and includes 41 labs, eight classrooms, 11 study areas, 183 offices and a video conference room.
UNIVERSITY NORTHERN BC CENTRE
PRINCE GEORGE, BRITISH COLUMBIA


Providing a progressive office space combined with conference and private hotel facilities, the Suncor Business Centre alleviates office overcrowding at the oilsands plant site while offering unique corporate services.
SUNCOR BUSINESS CENTRE
FORT MCMURRAY, ALBERTA


As Bird's first project with Concert Properties Limited, the CE Franklin Warehouse consists of a 145,000 square foot warehouse and offices - making it one of the largest industry distribution centres in Canada.
CE FRANKLIN WAREHOUSE
EDMONTON, ALBERTA


The Alberta Pipe Trades College houses seven shops, 14 classrooms, demonstration labs, student amenity spaces, administration area and instructor offices.
ALBERTA PIPE TRADES COLLEGE
EDMONTON, ALBERTA


On the site of Alberta’s first reclaimed oilsands tailing pond, Bird was contracted by Suncor Energy to construct an observation platform to showcase Suncor’s commitment to the environment.
WAPISIW LOOKOUT
FORT MCMURRAY, ALBERTA


Working within the operational Milner Ridge Correctional Centre, Bird constructed an addition to address Manitoba’s efforts to increase capacity to the adult correction system.
MILNER RIDGE CORRECTIONAL CENTRE
BEAUSEJOUR, MANITOBA


The Four Seasons Hotel provides chic accommodations within a 30 storey building comprised of 373 rooms.
FOUR SEASONS HOTEL
VANCOUVER, BRITISH COLUMBIA


Surrey Memorial Hospital offers family-focused care - from the birth of a baby to special care for seniors.
SURREY MEMORIAL HOSPITAL
SURREY, BRITISH COLUMBIA


With 31 floors, Claridges is a luxury condominium providing a panoramic view of the Vancouver skyline and the coast mountains.
CLARIDGES CONDOMINIUMS
BURNABY, BRITISH COLUMBIA


The 442 Transport and Rescue Squadron hangar facility for 19 Wing Canadian Forces Base Comox has been designed as a post-disaster facility to maintain operations in emergency situations.
19 WING TRANSPORT & RESCUE HANGAR
COMOX, BRITISH COLUMBIA


The 442 Transport and Rescue Squadron fixed wing hangar for 19 Wing Canadian Forces Base Comox addition was designed as a post-disaster facility.
19 WING FIXED WING HANGAR ADDITION
COMOX, BRITISH COLUMBIA


Bird completed interior and exterior renovations to the Swartz Bay and Tsawwassen foot passenger terminals. Work also included renovating the Lands End Caf
BC FERRY TERMINALS
DELTA, BRITISH COLUMBIA


The University of British Columbia’s new swing space facility houses students that are displaced on campus due to the construction of other buildings.
UNVERSITY OF BC SWING SPACE
VANCOUVER, BRITISH COLUMBIA


Each Joey’s Restaurant is designed with its particular surroundings in mind - Joey’s on Broadway features a rooftop patio, a cabana bar and a dramatic glass sculpture.
JOEY’S RESTAURANT
VANCOUVER, BRITISH COLUMBIA


As the Maritimes’ first auto mall, O’Regan’s houses four full-sized automobile dealers within one central facility.
O'REGAN'S AUTO MALL
DARTMOUTH, NOVA SCOTIA


A 40,000 square foot facility for Pattison Outdoor Advertising provides warehouse facilities and administration space.
PATTISON ADVERTISING WAREHOUSE
DARTMOUTH, NOVA SCOTIA


Located within the boundaries of the World Heritage District, the new elementary Bluenose Academy houses over 600 students.
BLUENOSE ACADEMY
LUNENBURG, NOVA SCOTIA


Abbey St. Andrew is an affordable living housing development that features 86 apartment-style units and 10 townhouse units with underground parking garage and a private courtyard area for the tenants.
Abbey St. Andrew Apartments
SAINT JOHN, NEW BRUNSWICK


Bird set a Canadian construction record for the use of the tallest concrete tilt-up panels on the Chilliwack Cultural Centre.
Chilliwack Cultural Centre
CHILLIWACK, BRITISH COLUMBIA


The Sisters of Charity of Immaculate Conception residence is a three-storey addition to the existing residence and nursing home.
SISTERS OF CHARITY RESIDENCE
SAINT JOHN, NEW BRUNSWICK


Designed as a new educational centre for the Coady International Institute, Bird integrated five century-old buildings into one on the St. Francis Xavier campus.
ST. FX COADY INSTITUTE
ANTIGONISH, NOVA SCOTIA


The Saint John Hyundai building design includes a spacious 20-foot-high showroom with floor-to-ceiling windows that allow daylight to flood inside.
HYUNDAI DEALERSHIP
SAINT JOHN, NEW BRUNSWICK


The Thornwood Residences Phase 1 is a 10-storey luxury condominium that includes two-storeys of below grade parking and extensive exterior detailing and landscaping.
THORNWOOD CONDOMINIUMS PH. 1
TORONTO, ONTARIO


A 1,000 seat complex, built for use by the Winnipeg Soccer Federation, is the first regulation-size free-span indoor soccer complex in Manitoba.
WINNIPEG INDOOR SOCCER COMPLEX
WINNIPEG, MANITOBA


Canadian forces Base in Borden, Ontario is the home to the support trianing group and is the largest Canadian Forces facility that trains and educates on average, 9,500 military support personnel annually.
CFB TRAINEE ACCOMMODATIONS
BORDEN, ONTARIO


As one of the three original chalets constructed on the side of Tunnel Mountain in 1948, Bird revitalized and expanded the Donald Cameron Centre.
DONALD CAMERON CENTRE
BANFF, ALBERTA


The visually stunning Blue Mountain Conference Centre features breathtaking views of the Niagara Escarpment and Georgian Bay.
BLUE MOUNTAIN CONFERENCE CENTRE
COLLINGWOOD, ONTARIO


Bird was given a tight five month time frame to convert an existing manufacturing facility into an office and distribution centre meeting Estee Lauder’s stringent requirements.
ESTEE LAUDER DISTRIBUTION CENTRE
TORONTO, ONTARIO


The Department of National Defence Area Support Unit (ASU) London supports 2,800 reservists, 5,000 cadets and 300 cadet instructors located throughout southwestern Ontario.
NATIONAL DEFENCE AREA SUPPORT UNIT
LONDON, ONTARIO


The redevelopment plan for the Erin Mills Town Centre involved upgrades and reconfiguration that were completed in four phases encompassing 50,000 square feet of existing retail space.
ERIN MILLS TOWN CENTRE
MISSISSAUGA, ONTARIO


In addition to an exterior garden centre and green house, each Rona store features a boutique concept, unique in the home renovations industry,
RONA HOME & GARDEN
VARIOUS LOCATIONS, MANITOBA & ONTARIO


As one of Winnipeg’s largest retail destinations, spanning 46 acres, Kenaston Common was delivered in 10 phases over five years by Bird.
KENASTON COMMON RETAIL
WINNIPEG, MANITOBA


With the advent of a grocery component in Shoppers Drug Mart stores, the Shoppers Drug Mart regional distribution facility required an expansion of 80,300 square feet.
REGIONAL DISTRIBUTION CENTRE
MISSISSAUGA, ONTARIO


Two consecutive design-build contracts were awarded to Bird to expand and renovate the existing Petrie Science & Engineering Building for York University.
YORK UNIVERSITY RESEARCH FACILITY
TORONTO, ONTARIO


Bird’s focus on creating a service oriented organization has enabled the company to establish and maintain loyal partnerships with many clients including Sobeys.
SOBEYS PORTFOLIO
VARIOUS LOCATIONS, NEW BRUNSWICK


Pinewood Toronto Studios Filmport houses the largest purpose-built sound stage in North America and five smaller sound stages and production support space.
PINEWOOD FILMPORT
TORONTO, ONTARIO


Tsawwassen Quay Market is situated at the BC Ferries Tsawwassen Terminal. Located at the entry point for travelers heading to and from the Lower Mainland to Victoria, Nanaimo and the Southern Gulf Islands.
BC FERRY TSAWWASSEN QUAY MARKET
DELTA, BRITISH COLUMBIA


As one of the busiest pedestrian thoroughfares on the York University campus, the Accolade Colonnade provides an indoor walkway and comfortable environment for commuters waiting for public transit.
YORK UNIVERSITY ACCOLADE COLONNADE
TORONTO, ONTARIO


The Square One Retail Centre project included a shell building for future retail tenants and a large parking lot for the centre.
SQUARE ONE RETAIL CENTRE
MISSISSAUGA, ONTARIO


The St. Stephen Border Crossing spans 20 acres includes four buildings and 1.55 miles of new road construction to connect to the NB provincial highway system.
St. Stephen Border Crossing
ST. STEPHEN, NEW BRUNSWICK


Accommodating up to 225 guests, the Riverway Golf Clubhouse sets a warm and inviting atmosphere for visitors with its exposed glulam columns and beams.
RIVERWAY CLUBHOUSE
BURNABY, BRITISH COLUMBIA


Converted from a long-term care facility, 717 Broadview Avenue is now a 60-unit affordable living rental apartment for seniors.
717 BROADVIEW AVENUE APARTMENTS
TORONTO, ONTARIO


One32 Berkeley is a prime rental complex located in downtown Toronto - it has 177 rental units laid out in a 10-storey tower with a 810 square metre floor plate.
ONE32 BERKELEY APARTMENTS
TORONTO, ONTARIO


Amica at Dundas is a six-storey Victorian-style, mature living residence that provides a range of spacious, self-contained studios and one- or two-bedroom suites.
Amica at Dundas Residence
HAMILTON, ONTARIO


In 1972, Bird built what is now western Canada’s oldest civic gallery - the sixth largest in the country. The Winnipeg Art Gallery continues to work with Bird on multiple renovation projects.
Winnipeg Art Galley
WINNIPEG, MANITOBA


The addition to the Spinks building at the University of Saskatchewan includes state-of-the-art laboratories for research and senior undergraduate instruction.
UNIVERSITY OF SASK. SPINKS ADDITION
SASKATOON, SASKATCHEWAN


The Trout Lake Community Centre forms a single facility with the Trout Lake Arena, originally constructed by Bird in 2009.
Trout Lake Arena
VANCOUVER, BRITISH COLUMBIA


The South Beach Casino includes table games, slot machines, a 112-seat cosmopolitan restaurant and a 123-seat bar/cabaret.
South Beach Casino
WINNIPEG, MANITOBA


Bird has completed multiple projects for Zellers across Manitoba and Alberta including store fit-ups, conversions and renovations.
ZELLERS PORTFOLIO
VARIOUS LOCATIONS, MANITOBA & ALBERTA


The Winnipeg East District Police Station combines District 4 and 5 to improve police operations and enhance public safety.
Winnipeg East District Police Station
BOUNDARY TRAILS MORDEN, MANITOBA


Consistent with the South Beach art-deco style, the casino addition to the South Beach Resort provides an added tourist attraction to the area.
South Beach Casino Hotel
SCANTERBURY, MANITOBA


The Noramac Shop & Office Warehouse consists of a multi-purpose area for the servicing of mine trucks as well as offices and training areas.
NORAMAC TRUCK SHOP
EDMONTON, ALBERTA


The Suncor Millennium Naptha Unit and Hydrogen Plant allows Suncor Energy to produce higher volumes of low-sulphur naphtha for further processing at their refineries.
Suncor Millennium Naptha & Hydro Plant
FORT MCMURRAY, ALBERTA


As a model for more sustainable designs in the Northern Alberta region, the Northern Sunrise County water treatment plant is the region’s first LEED silver plant.
NORTHERN SUNRISE WATER TREATMENT PLANT
PEACE RIVER, ALBERTA


Suncor’s Steepbank Mine Equipment Maintenance (MEM) Truck Shop is a six-bay addition to an existing truck shop, which was originally built by Bird.
SUNCOR STEEPBANK MINE TRUCK SHOP
FORT MCMURRAY, ALBERTA


Constructing the foundations and piles for the Kearl Ore Preparation Plant, Bird managed the site work that included excavation, foundations and backfilling.
Kearl Ore Preparation Plant
FORT MCMURRAY, ALBERTA


The Consumers Co-operative Refineries Ltd. Control Operations Centre was built within the blast zone of an active plant with pre-cast walls.
CONSUMERS CONTROL OPERATIONS CENTRE
REGINA, SASKATCHEWAN


Syncrude’s Mildred Lake facility in Fort McMurray produces approximately 13% of Canada’s total oil needs. Bird has helped Imperial Oil to expand their operations with two new builds.
SYNCRUDE MINE TRUCK MAINTENANCE BAYS
FORT MCMURRAY, ALBERTA


The Kearl South Maintenance Support Facility is situated on one of the largest open-pit mining operations in Canada.
KEARL SOUTH MAINTENANCE FACILITY
FORT MCMURRAY, ALBERTA


Located on the Kirby In-Situ Oilsands Project, Bird is constructing three industrial buildings for oil treatment, water treatment and steam generation.
KIRBY IN-SITU SAGD BUILDINGS
FORT MCMURRAY, ALBERTA


The MoZo (Modern Living Zone) Condominiums is a 14-storey, 211 unit condominium located at the corner of King Street and Sherbourne Street, the heart of the design and media neighbourhood.
MOZO CONDOMINIUMS
TORONTO, ONTARIO


As an addition and renovation to an existing refrigerated distribution warehouse, Bird completed the facility with a dramatic reduction in expansion joints, thereby reducing the demand on maintenance.
Safeway Refrigerated Warehouse
CALGARY, ALBERTA


Located on the campus lands at the Trafalgar Road location, the new Sheridan College Student Residence was built to accommodate the increasing student population at the Sheridan College campus.
Sheridan College Student Residence
Oakville, Ontario


As the general contractor, Bird’s scope of work included traditional medicine rooms, ceremonial circles, as well as rooms to accommodate the dental, physiotherapy, therapy, examination, laboratories and community health.
Paul First Nation Health Centre
Duffield, Alberta


Prior to the construction of the new Calgary Emergency Operations Control Centre, Bird had to temporary relocate the operations centre while the new facility was being built.
Emergency Centre Relocation
CALGARY, ALBERTA


Bird has completed renovation upgrades to the Delta Hotel in Fredericton. The project consisted of a multi-phase approach in which Bird renovated all the public spaces and kitchen.
Delta Hotel Refurbishment
fredericton, new brunswick


The new wellness centre features a centering space, examination and health service rooms and office space.
Fort Nelson First Nation’s Wellness Centre & Dance Arbor
Fort Nelson, British Columbia


The clearwell for the City of Winnipeg included the completion of the main concrete reservoir structure for the new water treatment plant facility at the city's Deacon Reservoir.
WATER TREATMENT PLANT CLEARWELL
WINNIPEG, MANITOBA


The raw water pumping station for Winnipeg's Deacon Reservoir pumps untreated water into the main treatment plant.
RAW WATER PUMPING STATION
WINNIPEG, MANITOBA


This project for Winnipeg's Deacon Reservoir includes a standby generator building and seven ancillary buildings.
STANDBY GENERATOR BUILDING
WINNIPEG, MANITOBA


The project scope included draining, refurbishing, commissioning and reactivating three clarifiers at the City of Winnipeg's North End Water Pollution Control Centre.
POLLUTION CONTROL CENTRE CLARIFIERS
WINNIPEG, MANITOBA


A multi-trade civil water treatment plant for the City of Winnipeg including a sodium hypochlorite generation building and a bulk chemical storage building.
CHEMICAL STORAGE BUILDINGS
WINNIPEG, MANITOBA


A series of residue ponds for the Inco Hydromet Demonstration Plant included site overburden stripping, pond excavation and berm construction and the installation of geomembrane liners in all of the ponds.
HYDROMET PLANT RESIDUE PONDS
ARGENTIA, NEWFOUNDLAND & LABRADOR


The Canadian North American Air Defence (NORAD) Regional/Sector Area Operations Centre is a new above-grade secure facility housing the new Air Operations Centre.
NORAD Operations Centre
North Bay, Ontario


The Defence Research & Development Canada (DRDC) project included renovations to two research facilities.
Defence Research & Development Canada Buildings
Toronto, Ontario


The Brandon University project included an extensive renovation to the century old Clark Hall buildings, as well as the construction of a new addition.
Brandon University Renovations
Brandon, Manitoba


As the operations centre of the entire local hydro utility, the Manitoba Hydro System Control Complex must remain functional at all times to supply continuous power to Manitoba customers.
SYSTEM CONTROL COMPLETE
Winnipeg, Manitoba


The Brandon General Hospital required an expansion for a new powerhouse facility, the Energy Centre, which played a key role in the expansion plan for this large health care facility.
BRANDON HOSPITAL ENERGY CENTRE
Brandon, Manitoba


The Club Regent Casino Hotel features a casino complex connected to a 146 room hotel in the city of Winnipeg.
CLUB REGENT CASINO HOTEL
Winnipeg, Manitoba


The Sagkeeng First Nation School features several architectural elements including a circular rotunda, built on a complex and uniquely designed structural compression ring.
SAGKEENG FIRST NATION SCHOOL
Fort Alexander, Manitoba


The Banff Trail Light Rail Transit Passenger Building contains two open-air precast platforms and a glass passenger holding building.
BANFF L.R.T. PASSENGER Building
Calgary, Alberta


The Alberta Cancer Board’s Tom Baker Cancer Centre project consisted of a three-storey addition to the existing building, which also underwent renovations to update the facility.
TOM BAKER CANCER CENTRE
Calgary, Alberta


Delivered on-time to meet the start of the University of Lethbridge’s academic year, the campus housing consists of two three-storey apartments.
UNIVERSITY OF LETHBRIDGE CAMPUS HOUSING
Lethbridge, Alberta


The Salvation Army Children’s Village is a two-storey building that provides care to students with emotional and behavioural difficulties in their community schools.
Salvation Army Children’s Village
Calgary, Alberta


The Calgary West Remand Centre provides housing for 704 remanded male and female inmates who are awaiting trial, sentenced inmates with further charges and inmates waiting transfer.
CALGARY WEST REMAND CENTRE
Calgary, Alberta


The Crowfoot YMCA boasts a salt water pool, a depth training pool, gymnasium, multi-purpose rooms, community meeting rooms, strength and conditioning area and a running track.
Crowfoot YMCA
Calgary, Alberta


A state-of-the-art facility, the Colonel J.J. Parr Sports Centre provides premier fitness amenities for the Air Command.
COLONEL J.J. PARR SPORTS CENTRE
Cold Lake, Alberta


Located in the historic fishing community of Stevenson, British Columbia, the McMath Secondary School provides space to over 1,500 students.
McMath SECONDARY School
Richmond, British Columbia


Bird’s third project at the Richmond Hospital, the Emergency and Diagnostic Imaging facility included the renovation and expansion of the existing departments' spaces.
RICHMOND HOSPITAL EMERGENCY CENTRE
Richmond, British Columbia


The Terry Fox Secondary School is designed to accommodate 2,000 students within the two-storey concrete and steel structure.
Terry Fox School
Port Coquitlam, British Columbia


Two separate buildings for Toyota Canada were constructed including a Zone Office and Parts Distribution Warehouse.
Toyota office & distribution CENTRE
Richmond, British Columbia


Toyota, Lexus and Volvo are among the dealerships located within the Northshore Automall.
Northshore Automall
North Vancouver, British Columbia


A global health science company, Nordion is one of the world’s largest provider of isotopes used to diagnose cancer.
MDS Nordion OFFICE
Vancouver, British Columbia


The Air Canada Flight Training Centre is a two-storey addition to the existing Flight Simulator Building at the Vancouver International Airport.
AIR CANADA FLIGHT TRAINING CENTRE
Richmond, British Columbia


St. Boniface’s warehouse, delivered under a tight schedule, is comprised of concrete foundations, steel frame and metal cladding.
ST. BONIFACE WAREHOUSE
WINNIPEG, MANITOBA


As Manitoba’s oldest golf course established in 1894, Southwood Golf & Country Club is the premier private club in south Winnipeg.
SOUTHWOOD GOLF & COUNTRY CLUB
WINNIPEG, MANITOBA


Located in the heart of the McKenzie Towne community in Calgary, the McKenzie Towne Retirement Residence is comprised of 147 units.
MCKENZIE TOWNE RETIREMENT RESIDENCE
CALGARY, ALBERTA


Edgemont Retirement Residence consists of interior renovations within the 133 unit, 110,000 square foot residence.
EDGEMONT RETIREMENT RESIDENCE
CALGARY, ALBERTA


Interior renovations to an existing 133 unit, 110,000 square foot residence, the Scenic Acres Retirement Residence remained operational during renovations necessitating the utmost consideration to the health and safety of the residents.
SCENIC ACRES RETIREMENT RESIDENCE
CALGARY, ALBERTA


The Maple Leaf Self Storage Facilities showcase Bird’s innovative design solutions with self storage facilities.
MAPLE LEAF SELF STORAGE CALGARY
CALGARY, ALBERTA


This 40,000 square foot facility for Larco Investments Ltd. offers commercial space for front offices and rear warehousing space with loading docks.
LARCO OFFICE & WAREHOUSE
CALGARY, ALBERTA


The International Brotherhood of Boilermakers Training Centre and Union Hall is a state-of-the-art 18,000 square foot facility that replaces their existing building.
BOILERMAKERS TRAINING CENTRE
CALGARY, ALBERTA


Situated within the heavy industrial area of Strathcona County, northeast of Edmonton, Bird was contracted to deliver an administration and maintenance building.
HEARTLAND MAINTENANCE BULDING
FORT SASKATCHEWAN, ALBERTA


The Engineers Facility required a renovation of a bowling alley into a high-end office space, meeting area and training centre for the Operating Engineers Local 955.
LOCAL 955 ENGINEERS OFFICE
FORT MCMURRAY, ALBERTA


The Coca-Cola Centre was constructed to meet the growing demand for minor hockey and recreational skating facilities in the Grande Prairie area.
COCA-COLA CENTRE
GRANDE PRAIRIE, ALBERTA


The Waterford is a lavish, one suite-per-floor, 12 level condominium located in Vancouver’s prestigious lower Shaugnessey area.
WATERFORD CONDOMINIUMS
VANCOUVER, BRITISH COLUMBIA


The construction of the Richmond General Hospital Phase 2 includes ambulatory care, psychiatry, administration and a full lecture theatre.
RICHMOND HOSPITAL PH. 2
RICHMOND, BRITISH COLUMBIA


The West Coast General Hospital is a community hospital with 52 acute beds and a separate 32 bed multilevel care facility.
WEST COAST GENERAL HOSPITAL
PORT ALBERNI, BRITISH COLUMBIA


The addition to the Comox Valley Airport included more customs and security areas to accommodate passengers, and an additional independent baggage carousel.
COMOX VALLEY AIRPORT
COMOX, BRITISH COLUMBIA


The Maple Leaf Self Storage facility was uniquely designed to enable the interior locker systems to require less structural steel, thereby reducing costs and shortening the construction schedule.
MAPLE LEAF SELF STORAGE COQUITLAM
COQUITLAM, BRITISH COLUMBIA


Located on a tight site, the Maple Leaf Self Storage facility had only one point of access and limited layout space for construction materials.
MAPLE LEAF SELF STORAGE VANCOUVER
VANCOUVER, BRITISH COLUMBIA


The 225-seat lecture theatre at Simon Fraser University Central City Campus is the first phase of SFU’s new Surrey Campus.
SIMON FRASER UNIVERSITY LECTURE THEATRE
SURREY, BRITISH COLUMBIA


With self storage units ranging from 25 to 300 square feet and eight feet high, the Maple Leaf facility appeals to both household and business storage customers.
MAPLE LEAF SELF STORAGE VANCOUVER
VANCOUVER, BRITISH COLUMBIA


The two-storey addition, Abdul Ladha Science Centre for University of British Columbia, was completed with a student union facility, meeting areas and lounge.
UNIVERSITY OF BC SCIENCE CENTRE
VANCOUVER, BRITISH COLUMBIA


Commissioned for the base building construction, Bird built the new Brick retail building for the Surrey South Shopping Centre.
THE BRICK
SURREY, BRITISH COLUMBIA


Replacing deteriorating schools in the area, the new Oxford School Primary to Grade 12 provides a cafeteria, performing arts stage, gymnasium, lockers, change rooms and showers, classrooms and a library.
OXFORD SCHOOL
OXFORD, NOVA SCOTIA


Designed as the recreational and social heart of the community, the Prospect Road Community Centre has a gym, fitness centre, meeting rooms and multi-purpose studios.
PROSPECT RD COMMUNITY CENTRE
HATCHET LAKE, NOVA SCOTIA


Built into the side of a hill, the new two-storey LC Skerry School employed the use of retaining walls and tilt-up construction methods for the building envelope.
LC SKERRY SCHOOL
WAVERLEY, NOVA SCOTIA


As the first elementary and junior high school in Nova Scotia to achieve LEED Gold certification, the Kings County Academy built by Bird accommodates up to 600 students.
KINGS COUNTY ACADEMY
KENTVILLE, NOVA SCOTIA


As the largest multi-use year round recreational facility in Atlantic Canada, the East Hants Sportsplex promotes an active and healthy lifestyle for its residents while also serving the larger communities from Truro to Halifax.
EAST HANTS SPORTSPLEX
LANTZ, NOVA SCOTIA


The Spatz Theatre is a multi-functional, 798-seat performance space designed to provide exceptional theatrical and musical experiences for Citadel High Students and the greater Halifax community.
SPATZ THEATRE
HALIFAX, NOVA SCOTIA


The Dutch Settlement Fire Station includes a three-door apparatus bay, office space, lounge areas, a kitchen, locker rooms and maintenance rooms.
DUTCH SETTLEMENT FIRE STATION
DUTCH SETTLEMENT, NOVA SCOTIA


The Nubody’s Fitness interior fit-up included renovations to the fitness rooms, lobby, and male and female washrooms and shower facilities.
NUBODY’S FITNESS
NEW GLASGOW, NOVA SCOTIA


An additional 16,000 square foot building shell was added to the existing 45,000 square foot Granite Drive Plaza. Major retailers include Winners and Future Shop.
GRANITE DRIVE PLAZA
NEW MINAS, NOVA SCOTIA


As part of Mount Saint Vincent University’s facilities improvement project, Bird renovated the three storey multi-purpose student space, Evaristus Hall.
EVARISTUS HALL
HALIFAX, NOVA SCOTIA


As one of the largest senior care homes in New Brunswick, Loch Lomond Villa Apartments have undergone many renovations to the two high-rise apartments.
LOCH LOMOND VILLA APARTMENTS
SAINT JOHN, NEW BRUNSWICK


Hospice Greater Saint John is the first residential hospice in Atlantic Canada providing 24-hour medical and non-medical care.
HOSPICE GREATER SAINT JOHN
SAINT JOHN, NEW BRUNSWICK


The 40,000 square foot, three-storey addition to Market Square for Genesys Telecommunications included a new office space and stand-alone entrance.
GENESYS TELECOMMUNICATIONS OFFICE
SAINT JOHN, NEW BRUNSWICK


Servicing the residents of the Saint John West area, the Fairville Boulevard Plaza houses retailers including Staples, Dollarama, Sobeys and Bulk Barn.
Fairview Boulevard Plaza
SAINT JOHN, NEW BRUNSWICK


As Hampton’s first senior affordable-living apartment housing, Ossekeag Place is a modern wood-framed three-storey, 32-unit complex.
Ossekeag Place Apartments
HAMPTON, NEW BRUNSWICK


The Alcool NB Liquor’s new outlet is a unique concept of store merchandising with the project’s incorporation of a refurbished Canadian Pacific Railway station.
Alcool NB Liquor Store
FREDERICTON, NEW BRUNSWICK


Situated in the heart of the entertainment district of Toronto, the District Lofts Condominiums and retail development is home to 148 two-storey loft-style suites.
DISTRICT LOFTS CONDOMINIUMS
TORONTO, ONTARIO


Located in the heart of downtown Toronto, the Volvo Dealership is comprised of a showroom, administration area, dealership operations and service shop.
VOLVO DEALERSHIP
TORONTO, ONTARIO


Located on the second level of the shopping centre, Bird completed a conversion of an existing cinema space into a GoodLife Fitness Centre.
GOODLIFE FITNESS CENTRE
TORONTO, ONTARIO


Bird has assisted Morguard on a repeat basis - helping to build Morguard’s real estate portfolio.
MORGUARD PORTFOLIO
BRAMPTON & NORTH BAY, ONTARIO


Working within a busy mall, Bird reconfigured existing retail units to provide the tenant fit-up for the Lime Ridge Mall’s new H&M fashion store.
H&M STORE
HAMILTON, ONTARIO


Originally constructed by Bird, Michael-Angelo’s Market Place required an expansion to accommodate its growing business.
MICHAEL-ANGELO'S MARKET PLACE
MARKHAM, ONTARIO


Bird constructed three Lowe’s Home Improvement warehouses, each store was over 140,000 square feet of retail space and a 30,000 square foot garden centre.
LOWE’S
VARIOUS LOCATIONS, ONTARIO


Situated within this heritage facility is one of four major University of Toronto art galleries - the Justina M. Barnicke Gallery features a collection of historical and contemporary Canadian art.
JUSTINA M. BARNICKE GALLERY
TORONTO, ONTARIO


The Radisson Hotel is a 16 floor, 204 bedroom, full-service hotel located in the heart of Markham.
RADISSON HOTEL
TORONTO, ONTARIO


The 17 Wing Fitness and Recreation Centre in Winnipeg received a 14,500 square foot addition to an existing multi-purpose sports and recreation facility.
17 WING FITNESS & REC CENTRE
WINNIPEG, MANITOBA


The Shilo Family Resource Centre and Day Care replaces a number of undersized and outdated base personal support and community facilities.
SHILO FAMILY RESOURCE CENTRE
SHILO, MANITOBA


The Canad Inns Hotel consists of 159-guest rooms, a two-storey water slide and pool area, a 250-seat restaurant with three 57-person capacity private dining rooms.
Canad Inns Hotel brandon
BRANDON, MANITOBA


Adding to the Keystone Centre, Manitoba’s largest year-round multi-functional facility for sporting, hospitality, agricultural and cultural events, is the Agriculture Centre of Excellence.
Keystone Centre Agriculture Centre
BRANDON, MANITOBA


The project is a single storey addition to the diagnostic imaging department of the 94-bed Boundary Trails Health Centre.
BOUNDARY TRAILS HOSPITAL
MORDEN, MANITOBA


The Manitoba Medical Association building features offices, a gym and kitchen - all arranged around a central courtyard naturally illuminated by clerestory windows.
Manitoba Medical Association Building
WINNIPEG, MANITOBA


The fitness facility at the Canadian forces Base in Shilo required a renovation and addition to support its members, which included new offices, storage areas and fitness facilities.
CFB SHILO FITNESS CENTRE
SHILO, MANITOBA


The Boot is a 12-storey condominium residence in downtown Toronto located amongst a hub of cinemas, restaurants, theatres and the Ryerson University campus.
The Boot Condominiums
TORONTO, ONTARIO


Manitoba Hydro’s Dorsey Converter Station is the southern terminus for the utility’s high voltage direct current transmission lines.
DORSEY CONVERTER STATION
WINNIPEG, MANITOBA


At the bitumen extraction plant on the Horizon Oil Sands site, Bird designed and built two maintenance buildings containing maintenance bays to service equipment.
BITUMEN MAINTENANCE BUILDING
FORT MCMURRAY, ALBERTA


The Shell Jackpine project was constructed under a design-build contract and provides potable water treatment and wastewater treatment facilities for the Albian Sand’s mine expansion.
SHELL JACKPINE WASTE & WATER TREATMENT PLANT
FORT MCMURRAY, ALBERTA


As part of the Suncor Voyageur plant, Bird constructed the sulphur pits to enable the storage of molten sulphur before transferring it to the Voyageur upgrader expansion.
Suncor Voyageur Sulphur Pits
FORT MCMURRAY, ALBERTA


The scope of work for the Suncor Millennium Lodge included conventional wood frame construction with floor and roof trusses, and metal framing anchors.
Suncor Millennium Lodge Renovation
Fort McMurray, ALBERTA


The new MacKenzie pump house and reservoir facility has increased the storage capacity of the MacKenzie reservoir to 520,800 cubic feet and the pumping capacity to 500 litres per second.
MacKenzie Pumphouse & Reservoir Facility
FORT MCMURRAY, ALBERTA


Bird constructed the maintenance building and provided an expansion to the existing administration building at the MEG Energy Corporation oilsands plant.