Skip to main content
logo-bird-white

CFB Trenton Electrical and Mechanical Equipment Facility - 8 Wing

This two-storey facility includes a dispatch centre, administration, training and safety areas. The maintenance space includes a machine shop, welding centre, fabrication shop, fabric area, repair and paint facilities as well as a two-storey parts cell and tool crib with specialized equipment.

Client
DEFENCE CONSTRUCTION CANADA
Consultant
STANTEC INC.
Contract Type
STIPULATED SUM
Project Size
210,000 SQ. FT.
Duration
24 MONTHS
Project Value
$40,200,000
Interior of the Electrical and Mechanical Facility at 8 Wing showing work bays

Mechanical works include centralized systems for all maintenance operations such as motor oil, antifreeze, compressed air and breathing air. The project involved a phased turnover at the request of the Department of National Defence that included the relocation of approximately 600 pieces of furniture and equipment used within existing DND operations.