Airdrie Main Fire Hall

Offering many contributions to the project during the pre-construction and construction phases, Bird successfully completed the new 34,000 square foot fire department headquarters in Airdrie. The fire hall includes a high-quality training center, five fire truck bays, two ambulance bays, ten dorm rooms, a fitness room, office spaces, break rooms and a hose tower.

Client
THE CITY OF AIRDRIE
Consultant
GIBBS GAGE ARCHITECTS
Contract Type
STIPULATED SUM
Project Size
34,000 SQ. FT.
Duration
26 MONTHS
Project Value
$7,200,000
Exposed Structural Steel Walkway with Stairwell above Exit Doors

Bird’s design initiatives have included the installation of insulation inside the beams to increase energy efficiency within the fire hall and the use of an alternate integral concrete hardener - all of these contributions have reflected a positive impact on the constructability, durability, schedule and cost of the project. Construction also involved sustainable design principles including solar power and permeable paver parking stalls that will improve the energy efficiency of the building.