Under a tight schedule, the team undertook a substantial redesign of the core schools - maximizing constructability, decreasing cost, and improving the construction schedule. Throughout the design, the team used life cycle costing to ensure value for money and longevity of the products used. Load-bearing masonry was replaced with structural steel and infill block, and the foundation work was substantially decreased by the use of piles and grade beams.