Built for permanent long-term use, the facilities are structural steel-framed on driven pile foundations with concrete floor slabs. The major challenge of the project was the complete design and construction through a short schedule and tight budget. All work was simultaneously designed and constructed along with a complete infrastructure that included roadways, utilities, a two-million litre water reservoir, and wastewater treatment plant.