Highvale Mine Truck Maintenance Shop
Highvale Mine Truck Maintenance Shop
Highvale Mine Truck Maintenance Shop

Highvale Mine Truck Maintenance Shop

DUFFIELD, ALBERTA

CLIENT:TRANSALTA UTILITIES
CONSULTANT:SNC-LAVALIN INC.
CONTRACT TYPE:STIPULATED SUM
Project VALUE:26,700,000
Project SIZE:45,000 SQ. FT.
DURATION:13 MONTHS
Highvale Mine Truck Maintenance Shop

The addition to the existing Highvale maintenance facility includes three maintenance shop areas, a wash bay, sump and mezzanine. The 40 foot ceilings in the shops and wash bay allow sufficient space for the buckets of the heavy haulers to be positioned upright. Two-ton hoists and 50-ton cranes have also been installed throughout the facility.

In addition to the shop expansion, two new pre-engineered buildings have been constructed. A shower building that provides cleaning and locker facilities for staff and a second muster building that includes offices, meeting rooms and a covered canopy. Both buildings are connected to the central administration building by enclosed walkways.

Highvale Mine Truck Maintenance Shop
Highvale Mine Truck Maintenance Shop : Projects : Bird Construction