CLIENT: | DEPARTMENT OF TRANSPORTATION & INFRASTRUCTURE |
CONSULTANT: | HARVEY ARCHITECTURE |
CONTRACT TYPE: | DESIGN-BUILD |
Project VALUE: | $7,300,000 |
Project SIZE: | 44,000 SQ. FT. |
DURATION: | 12 MONTHS |
LEED CERTIFICATION LEVEL: | SILVER |

The construction of the new LC Skerry School began with the demolition of two existing schools that were built in the mid 1900s. Built into the side of a hill, the new two-storey school employed the use of retaining walls and tilt-up construction methods for the building envelope.
With Bird’s firm schedule and keen organization skills, construction was expedited on time for the upcoming school year. Bird was able to fast-track the schedule by performing the demolition and construction of the new structure concurrently, which required extensive coordination between Bird and its subcontractors.


LC Skerry School : Projects : Bird Construction