SkyTrain Operations and Maintenance Centre

The SkyTrain Operations and Maintenance Centre is equipped with various maintenance systems such as compressed air, a vacuum system, a grease system, a wheel press, and overhead cranes. The project also included the construction of a two-storey materials and equipment stores centre, along with the infilling of an existing interior open area to an additional electric shop. A large component of the project was the construction and tie-in of a new rail and rail spur line. The building is a structural steel project on concrete foundations and included the use of composite floors and an exterior finish of metal cladding.

Client
GREATER VANCOUVER TRANSPORTATION AUTHORITY
Consultant
STANTEC
Contract Type
CONSTRUCTION MANAGEMENT
Project Size
132,000 SQ. FT.
Duration
26 MONTHS
Project Value
$23,700,000
Exterior entrance of Sky Train showing cladding

A significant challenge during this project was maintaining the existing run-through facility and stores at a fully operational level during the demolition of existing structures, and construction of the additions.