Suncor Firebag 3 Village Camp Core

Bird's contract expanded as work progressed on the site and included a core building, site services, a generator and switch gear building, and a fire pump house building equipped with water storage tanks. The three-storey camp core building is constructed from 300 tons of structural steel, 2,000 cubic metres of concrete, insulated composite metal cladding, and exterior insulation and finishing system.

Client
Suncor Energy Inc.
Consultant
Jacobs Engineering Group Inc., Stantec, Barr Ryder Architects
Contract Type
Stipulated Sum
Project Size
7,500 sq. m
(80,700 sq. ft)
Duration
32 months
Project Value
Undisclosed
Aerial View of Construction Progress on Large Site

The camp provides residency for over 1,750 people and features a full-sized cafeteria, gymnasium, work studio, and lounges. The village's core building has attained LEED® Silver certification - one of the first buildings in the oilsands to achieve a LEED® certification.