Challenges on the project included maintaining pedestrian and staff safety during the initial demolition and throughout construction with the main access for the site located on the busy Lakeshore Blvd. West in downtown Toronto.
The project aims to minimize environmental impact and energy use, incorporating an UV treatment plant for storm water, heat recovery on the waste water, extensive use of LED lighting and a highly insulated envelope with a high albedo (white) roof.
[[Auto Insert Gallery here]]
Back to projects