Voisey's Bay Dock Project

Each circular cell consisted of 154 steel sheet piles each measuring 26.5-metres in length. Two spud barges equipped with crawler cranes positioned templates and drove the steel sheet piles around the cell circumference.

Client
Voisey's Bay Nickel Company, Ltd.
Consultant
SNC-LAVALIN
Contract Type
Unit Price
Project Size
Undisclosed
Duration
13 months
Project Value
$10,000,000
Construction Progress with Offshore Structural Steel, Caissons and Crane

A total of 42,050 cubic metres of crushed jaw run material was placed using backfilling operations. Wharf cells were protected using concrete ring beams measuring 5 x 3 x 0.6 metres. A total of 56 ring beams were installed.