With the success of the first contract, another a second contract was awarded to Bird to complete the floor addition to accommodate all-season research. The observatory was segregated into two rooms; one which is insulated was constructed so that the roof observatory hatches can be left open during the most frigid winter weather.
[[Auto Insert Gallery here]]
Back to projects