Phase 1 of this expansion project involved upgrading Enbridge’s Line 67 from Saskatchewan through Manitoba, incorporating six pump stations. Phase 2 involved the construction of pump stations in Manitoba (St. Leon and West Souris) and Saskatchewan (Odessa and Langbank) to increase the capacity of Line 67 from southeastern Alberta to southern Manitoba.
The new hospital is located on the same site as the current facility. It includes a floor area of over 27,270 square metres with 105 inpatient beds.