{"id":13846,"date":"2026-04-30T19:36:39","date_gmt":"2026-04-30T19:36:39","guid":{"rendered":"https:\/\/www.bird.ca\/?post_type=project&#038;p=13846"},"modified":"2026-04-30T19:36:40","modified_gmt":"2026-04-30T19:36:40","slug":"cfad-bm203","status":"publish","type":"project","link":"https:\/\/www.bird.ca\/fr\/project-experience\/project\/cfad-bm203\/","title":{"rendered":"CFAD BM203\u00a0"},"content":{"rendered":"<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>CFAD BM203 was a large-scale renovation and expansion of an existing 35,000\u2011square\u2011foot torpedo servicing facility, demonstrating expertise in complex industrial rehabilitation. The project involved near\u2011total demolition and abatement, preserving only the existing foundation and structural steel while fully overhauling the site and building systems. Scope included removal of the roof, slab\u2011on\u2011grade, and sub\u2011slab soils, complete demolition of mechanical and electrical systems, and selective reinforcement of the existing structure.<\/p>\n\n\n\n<p style=\"padding-top:var(--wp--preset--spacing--40);padding-bottom:var(--wp--preset--spacing--40)\">The facility was entirely reconstructed with new building envelope, systems, and finishes, effectively delivering a modernized, high\u2011performance building. An additional 8,000\u2011square\u2011foot expansion added service bays and a dedicated wash bay to support preventative maintenance of snow removal vehicles. The project required extensive contaminated materials remediation, significant structural repairs, and precise coordination, highlighting Bird\u2019s ability to safely deliver technically demanding renovations and additions within a sensitive environment.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\"><div class=\"project-record-block wp-block-create-block-project-record-block\">\n\t<div class=\"project-record-block__card\">\n\t\t<h3 class=\"project-record-block__title\">D\u00e9tails du projet<\/h3>\n\n\t\t<div class=\"project-record-block__grid\">\n\t\t\t\t\t\t\t<div class=\"project-record-block__entry\">\n\t\t\t\t\t<div class=\"project-record-block__icon\">\n\t\t\t\t\t\t<i class=\"ri-user-line\" aria-hidden=\"true\"><\/i>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"project-record-block__content\">\n\t\t\t\t\t\t<div class=\"project-record-block__label\">\n\t\t\t\t\t\t\tClient\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<div class=\"project-record-block__value\">\n\t\t\t\t\t\t\tConstruction de D\u00e9fense Canada \/ Minist\u00e8re de la D\u00e9fense nationale\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"project-record-block__entry\">\n\t\t\t\t\t<div class=\"project-record-block__icon\">\n\t\t\t\t\t\t<i class=\"ri-compasses-2-line\" aria-hidden=\"true\"><\/i>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"project-record-block__content\">\n\t\t\t\t\t\t<div class=\"project-record-block__label\">\n\t\t\t\t\t\t\tConsultant\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<div class=\"project-record-block__value\">\n\t\t\t\t\t\t\tAMEC Architectural Services\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"project-record-block__entry\">\n\t\t\t\t\t<div class=\"project-record-block__icon\">\n\t\t\t\t\t\t<i class=\"ri-edit-box-line\" aria-hidden=\"true\"><\/i>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"project-record-block__content\">\n\t\t\t\t\t\t<div class=\"project-record-block__label\">\n\t\t\t\t\t\t\tType de contrat\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<div class=\"project-record-block__value\">\n\t\t\t\t\t\t\tSomme stipul\u00e9e\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"project-record-block__entry\">\n\t\t\t\t\t<div class=\"project-record-block__icon\">\n\t\t\t\t\t\t<i class=\"ri-focus-3-line\" aria-hidden=\"true\"><\/i>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"project-record-block__content\">\n\t\t\t\t\t\t<div class=\"project-record-block__label\">\n\t\t\t\t\t\t\tTaille du projet\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<div class=\"project-record-block__value\">\n\t\t\t\t\t\t\t3,251m2 (35,000 ft2)\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"project-record-block__entry\">\n\t\t\t\t\t<div class=\"project-record-block__icon\">\n\t\t\t\t\t\t<i class=\"ri-calendar-line\" aria-hidden=\"true\"><\/i>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"project-record-block__content\">\n\t\t\t\t\t\t<div class=\"project-record-block__label\">\n\t\t\t\t\t\t\tDur\u00e9e\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<div class=\"project-record-block__value\">\n\t\t\t\t\t\t\t14 months (construction phase)\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"project-record-block__entry\">\n\t\t\t\t\t<div class=\"project-record-block__icon\">\n\t\t\t\t\t\t<i class=\"ri-coin-line\" aria-hidden=\"true\"><\/i>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"project-record-block__content\">\n\t\t\t\t\t\t<div class=\"project-record-block__label\">\n\t\t\t\t\t\t\tValeur du projet\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<div class=\"project-record-block__value\">\n\t\t\t\t\t\t\t$13M\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"project-record-block__entry project-record-block__entry--full\">\n\t\t\t\t\t<div class=\"project-record-block__icon\">\n\t\t\t\t\t\t<i class=\"ri-map-pin-line\" aria-hidden=\"true\"><\/i>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<div class=\"project-record-block__content\">\n\t\t\t\t\t\t<div class=\"project-record-block__label\">\n\t\t\t\t\t\t\tLocation\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<div class=\"project-record-block__value\">\n\t\t\t\t\t\t\tBedford, NS\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t<\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" src=\"https:\/\/cdn.bird.ca\/2026\/02\/04151223\/placeholder-image.png\" alt=\"\" class=\"wp-image-13437\" style=\"aspect-ratio:1.0471302399499778;object-fit:cover\" srcset=\"https:\/\/cdn.bird.ca\/2026\/02\/04151223\/placeholder-image.png 1200w, https:\/\/cdn.bird.ca\/2026\/02\/04151223\/placeholder-image-300x200.png 300w, https:\/\/cdn.bird.ca\/2026\/02\/04151223\/placeholder-image-1024x683.png 1024w, https:\/\/cdn.bird.ca\/2026\/02\/04151223\/placeholder-image-768x512.png 768w, https:\/\/cdn.bird.ca\/2026\/02\/04151223\/placeholder-image-18x12.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:65px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-create-block-gallery-slider\">\n\t<div class=\"gallery-slider-wrapper\">\n\t\t<div class=\"gallery-slider\" data-autoplay=\"true\"\n\t\t\tdata-delay=\"3000\"\n\t\t\tdata-dots=\"true\"\n\t\t\tdata-zoom=\"false\"\n\t\t\tdata-image-fit=\"cover\"\n\t\t\tdata-thumbnails=\"false\"\n\t\t\tdata-pause-on-hover=\"false\"\n\t\t\tdata-nav-arrows=\"true\">\n\t\t\t<div class=\"gallery-slider__slides\">\n\t\t\t\t\t\t\t\t\t<div class=\"gallery-slider__slide\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/cdn.bird.ca\/2026\/04\/23181541\/21178-DCC-CFAD-BM203-02.jpg\" alt=\"A modern, single-story building with metal siding is shown at sunset. Sunlight reflects off the windows. The empty parking lot in front has marked spaces and tall light poles. Trees are visible in the background.\"\n\t\t\t\t\t\t\t\tdraggable=\"false\" style=\"object-fit: cover;\">\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<button class=\"gallery-slider__nav gallery-slider__nav--prev\"\n\t\t\t\t\taria-label=\"Diapositive pr\u00e9c\u00e9dente\">\n\t\t\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 24 24\" width=\"24\" height=\"24\">\n\t\t\t\t\t\t<path d=\"M15.41 7.41L14 6l-6 6 6 6 1.41-1.41L10.83 12z\" \/>\n\t\t\t\t\t<\/svg>\n\t\t\t\t<\/button>\n\t\t\t\t<button class=\"gallery-slider__nav gallery-slider__nav--next\"\n\t\t\t\t\taria-label=\"Diapositive suivante\">\n\t\t\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 24 24\" width=\"24\" height=\"24\">\n\t\t\t\t\t\t<path d=\"M8.59 16.59L13.17 12 8.59 7.41 10 6l6 6-6 6z\" \/>\n\t\t\t\t\t<\/svg>\n\t\t\t\t<\/button>\n\t\t\t\n\t\t<\/div>\n\t\t\t\t\t<div class=\"gallery-slider__dots\">\n\t\t\t\t\t\t\t\t\t<span class=\"gallery-slider__dot\" data-slide=\"0\"><\/span>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>CFAD BM203 fut une r\u00e9novation et une extension \u00e0 grande \u00e9chelle d'une installation de maintenance de torpilles existante de 3\u00a0250 m\u00e8tres carr\u00e9s, d\u00e9montrant une expertise en r\u00e9habilitation industrielle complexe. Le projet comprenait une d\u00e9molition et une d\u00e9samiantage presque totales, ne conservant que la fondation et la structure en acier existantes tout en refaisant enti\u00e8rement le site et les syst\u00e8mes du b\u00e2timent. L'\u00e9tendue des travaux comprenait le retrait du toit, de la dalle sur terre-plein et des sols sous la dalle, la d\u00e9molition compl\u00e8te des syst\u00e8mes m\u00e9caniques et \u00e9lectriques, et le renforcement s\u00e9lectif de la structure existante.<\/p>","protected":false},"featured_media":13845,"template":"","tags":[],"market":[109,388],"delivery-model":[170],"service":[],"location":[493,150],"class_list":["post-13846","project","type-project","status-publish","has-post-thumbnail","hentry","market-defence","market-maintenance","delivery_model-stipulated-sum","location-bedford","location-nova-scotia"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.6 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>CFAD BM203\u00a0 | Bird Construction<\/title>\n<meta name=\"description\" content=\"CFAD BM203 was a large-scale renovation and expansion of an existing 35,000 square foot torpedo servicing facility, demonstrating expertise in complex industrial rehabilitation. The project involved near total demolition and abatement, preserving only the existing foundation and structural steel while fully overhauling the site and building systems. Scope included removal of the roof, slab on grade, and sub slab soils, complete demolition of mechanical and electrical systems, and selective reinforcement of the existing structure.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bird.ca\/fr\/experience-du-projet\/projet\/cfad-bm203\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CFAD BM203\u00a0 | Bird Construction\" \/>\n<meta property=\"og:description\" content=\"CFAD BM203 was a large-scale renovation and expansion of an existing 35,000 square foot torpedo servicing facility, demonstrating expertise in complex industrial rehabilitation. The project involved near total demolition and abatement, preserving only the existing foundation and structural steel while fully overhauling the site and building systems. Scope included removal of the roof, slab on grade, and sub slab soils, complete demolition of mechanical and electrical systems, and selective reinforcement of the existing structure.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bird.ca\/fr\/experience-du-projet\/projet\/cfad-bm203\/\" \/>\n<meta property=\"og:site_name\" content=\"Bird Construction\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Bird-Construction-Inc\/100064108594609\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-30T19:36:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.bird.ca\/2026\/04\/23181549\/21178-DCC-CFAD-BM203-01_Hero.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1353\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.bird.ca\\\/project-experience\\\/project\\\/cfad-bm203\\\/\",\"url\":\"https:\\\/\\\/www.bird.ca\\\/project-experience\\\/project\\\/cfad-bm203\\\/\",\"name\":\"CFAD BM203\u00a0 | Bird Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bird.ca\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.bird.ca\\\/project-experience\\\/project\\\/cfad-bm203\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bird.ca\\\/project-experience\\\/project\\\/cfad-bm203\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cdn.bird.ca\\\/2026\\\/04\\\/23181549\\\/21178-DCC-CFAD-BM203-01_Hero.jpg\",\"datePublished\":\"2026-04-30T19:36:39+00:00\",\"dateModified\":\"2026-04-30T19:36:40+00:00\",\"description\":\"CFAD BM203 was a large-scale renovation and expansion of an existing 35,000 square foot torpedo servicing facility, demonstrating expertise in complex industrial rehabilitation. The project involved near total demolition and abatement, preserving only the existing foundation and structural steel while fully overhauling the site and building systems. Scope included removal of the roof, slab on grade, and sub slab soils, complete demolition of mechanical and electrical systems, and selective reinforcement of the existing structure.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.bird.ca\\\/project-experience\\\/project\\\/cfad-bm203\\\/#breadcrumb\"},\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.bird.ca\\\/project-experience\\\/project\\\/cfad-bm203\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\\\/\\\/www.bird.ca\\\/project-experience\\\/project\\\/cfad-bm203\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cdn.bird.ca\\\/2026\\\/04\\\/23181549\\\/21178-DCC-CFAD-BM203-01_Hero.jpg\",\"contentUrl\":\"https:\\\/\\\/cdn.bird.ca\\\/2026\\\/04\\\/23181549\\\/21178-DCC-CFAD-BM203-01_Hero.jpg\",\"width\":1920,\"height\":1353,\"caption\":\"A modern industrial building with beige metal siding, several lit windows, a red door, and wet pavement reflecting the lights on a cloudy day.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.bird.ca\\\/project-experience\\\/project\\\/cfad-bm203\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.bird.ca\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CFAD BM203\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.bird.ca\\\/#website\",\"url\":\"https:\\\/\\\/www.bird.ca\\\/\",\"name\":\"Bird Construction\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.bird.ca\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.bird.ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.bird.ca\\\/#organization\",\"name\":\"Bird Construction\",\"url\":\"https:\\\/\\\/www.bird.ca\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\\\/\\\/www.bird.ca\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cdn.bird.ca\\\/2025\\\/01\\\/20212041\\\/bird-logo-RGB-e1739411338652.png\",\"contentUrl\":\"https:\\\/\\\/cdn.bird.ca\\\/2025\\\/01\\\/20212041\\\/bird-logo-RGB-e1739411338652.png\",\"width\":865,\"height\":366,\"caption\":\"Bird Construction\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bird.ca\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Bird-Construction-Inc\\\/100064108594609\\\/\",\"https:\\\/\\\/www.instagram.com\\\/birdconstructioninc\\\/\",\"https:\\\/\\\/ca.linkedin.com\\\/company\\\/bird-construction-inc\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CFAD BM203\u00a0 | Bird Construction","description":"CFAD BM203 fut une r\u00e9novation et une extension \u00e0 grande \u00e9chelle d'une installation de maintenance de torpilles existante de 3\u00a0250 m\u00e8tres carr\u00e9s, d\u00e9montrant une expertise en r\u00e9habilitation industrielle complexe. Le projet comprenait une d\u00e9molition et une d\u00e9samiantage presque totales, ne conservant que la fondation et la structure en acier existantes tout en refaisant enti\u00e8rement le site et les syst\u00e8mes du b\u00e2timent. L'\u00e9tendue des travaux comprenait le retrait du toit, de la dalle sur terre-plein et des sols sous la dalle, la d\u00e9molition compl\u00e8te des syst\u00e8mes m\u00e9caniques et \u00e9lectriques, et le renforcement s\u00e9lectif de la structure existante.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bird.ca\/fr\/experience-du-projet\/projet\/cfad-bm203\/","og_locale":"fr_CA","og_type":"article","og_title":"CFAD BM203\u00a0 | Bird Construction","og_description":"CFAD BM203 was a large-scale renovation and expansion of an existing 35,000 square foot torpedo servicing facility, demonstrating expertise in complex industrial rehabilitation. The project involved near total demolition and abatement, preserving only the existing foundation and structural steel while fully overhauling the site and building systems. Scope included removal of the roof, slab on grade, and sub slab soils, complete demolition of mechanical and electrical systems, and selective reinforcement of the existing structure.","og_url":"https:\/\/www.bird.ca\/fr\/experience-du-projet\/projet\/cfad-bm203\/","og_site_name":"Bird Construction","article_publisher":"https:\/\/www.facebook.com\/people\/Bird-Construction-Inc\/100064108594609\/","article_modified_time":"2026-04-30T19:36:40+00:00","og_image":[{"width":1920,"height":1353,"url":"https:\/\/cdn.bird.ca\/2026\/04\/23181549\/21178-DCC-CFAD-BM203-01_Hero.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimation du temps de lecture":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.bird.ca\/project-experience\/project\/cfad-bm203\/","url":"https:\/\/www.bird.ca\/project-experience\/project\/cfad-bm203\/","name":"CFAD BM203\u00a0 | Bird Construction","isPartOf":{"@id":"https:\/\/www.bird.ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bird.ca\/project-experience\/project\/cfad-bm203\/#primaryimage"},"image":{"@id":"https:\/\/www.bird.ca\/project-experience\/project\/cfad-bm203\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.bird.ca\/2026\/04\/23181549\/21178-DCC-CFAD-BM203-01_Hero.jpg","datePublished":"2026-04-30T19:36:39+00:00","dateModified":"2026-04-30T19:36:40+00:00","description":"CFAD BM203 fut une r\u00e9novation et une extension \u00e0 grande \u00e9chelle d'une installation de maintenance de torpilles existante de 3\u00a0250 m\u00e8tres carr\u00e9s, d\u00e9montrant une expertise en r\u00e9habilitation industrielle complexe. Le projet comprenait une d\u00e9molition et une d\u00e9samiantage presque totales, ne conservant que la fondation et la structure en acier existantes tout en refaisant enti\u00e8rement le site et les syst\u00e8mes du b\u00e2timent. L'\u00e9tendue des travaux comprenait le retrait du toit, de la dalle sur terre-plein et des sols sous la dalle, la d\u00e9molition compl\u00e8te des syst\u00e8mes m\u00e9caniques et \u00e9lectriques, et le renforcement s\u00e9lectif de la structure existante.","breadcrumb":{"@id":"https:\/\/www.bird.ca\/project-experience\/project\/cfad-bm203\/#breadcrumb"},"inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bird.ca\/project-experience\/project\/cfad-bm203\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.bird.ca\/project-experience\/project\/cfad-bm203\/#primaryimage","url":"https:\/\/cdn.bird.ca\/2026\/04\/23181549\/21178-DCC-CFAD-BM203-01_Hero.jpg","contentUrl":"https:\/\/cdn.bird.ca\/2026\/04\/23181549\/21178-DCC-CFAD-BM203-01_Hero.jpg","width":1920,"height":1353,"caption":"A modern industrial building with beige metal siding, several lit windows, a red door, and wet pavement reflecting the lights on a cloudy day."},{"@type":"BreadcrumbList","@id":"https:\/\/www.bird.ca\/project-experience\/project\/cfad-bm203\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.bird.ca\/"},{"@type":"ListItem","position":2,"name":"CFAD BM203\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/www.bird.ca\/#website","url":"https:\/\/www.bird.ca\/","name":"Bird Construction","description":"","publisher":{"@id":"https:\/\/www.bird.ca\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.bird.ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"},{"@type":"Organization","@id":"https:\/\/www.bird.ca\/#organization","name":"Bird Construction","url":"https:\/\/www.bird.ca\/","logo":{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.bird.ca\/#\/schema\/logo\/image\/","url":"https:\/\/cdn.bird.ca\/2025\/01\/20212041\/bird-logo-RGB-e1739411338652.png","contentUrl":"https:\/\/cdn.bird.ca\/2025\/01\/20212041\/bird-logo-RGB-e1739411338652.png","width":865,"height":366,"caption":"Bird Construction"},"image":{"@id":"https:\/\/www.bird.ca\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/people\/Bird-Construction-Inc\/100064108594609\/","https:\/\/www.instagram.com\/birdconstructioninc\/","https:\/\/ca.linkedin.com\/company\/bird-construction-inc"]}]}},"_links":{"self":[{"href":"https:\/\/www.bird.ca\/fr\/wp-json\/wp\/v2\/projects\/13846","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bird.ca\/fr\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.bird.ca\/fr\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bird.ca\/fr\/wp-json\/wp\/v2\/media\/13845"}],"wp:attachment":[{"href":"https:\/\/www.bird.ca\/fr\/wp-json\/wp\/v2\/media?parent=13846"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bird.ca\/fr\/wp-json\/wp\/v2\/tags?post=13846"},{"taxonomy":"market","embeddable":true,"href":"https:\/\/www.bird.ca\/fr\/wp-json\/wp\/v2\/market?post=13846"},{"taxonomy":"delivery_model","embeddable":true,"href":"https:\/\/www.bird.ca\/fr\/wp-json\/wp\/v2\/delivery-model?post=13846"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/www.bird.ca\/fr\/wp-json\/wp\/v2\/service?post=13846"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/www.bird.ca\/fr\/wp-json\/wp\/v2\/location?post=13846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}