Manufacturing, Pharmaceutical

Central Drug Production Facility

Alberta Health Services and Alberta Infrastructure have an exciting opportunity to develop Alberta’s first state-of-the-art central drug distribution service for acute care hospitals and long-term care facilities. This facility will meet NAPRA requirements and allow for more efficient, centralized medication distribution.

Client :
Infrastructure de l'Alberta

Consultant :
START Architecture

Type de contrat :
Somme stipulée

Taille du projet :
5,800 sq. m

Durée de l'enquête :
18 Months

Valeur du projet :
Cost Confidential

The project is a new single-storey/partial crawl space energy-efficient structure of approximately 5,800 m2 with 5 and 8-metre clear interior heights on a greenfield site. The building’s simplified form, limited glazing and high-performance building envelope are a response to the stringent operational and environmental requirements, dictated in large part by the processes, technology, and equipment specific to the demands of Sterile IV Production, Non-Sterile Compounding, Replenishing, and Dispensing of medication that is received, processed and shipped across central and northern Alberta.

Bird a été informé de contrats de fournisseurs frauduleux ciblant des fournisseurs potentiels et actuels. Veuillez faire preuve de prudence et vérifier vos coordonnées avant de communiquer vos renseignements de paiement ou d'accepter des demandes de crédit.