Bird has completed the construction of the new water treatment plant in Drayton Valley to replace the aging existing facility. The plant is able to produce 18 million litres of fresh water per day — more than doubling the previous capacity.
Client :
Ville de Drayton Valley
Consultant :
ISL Engineering and Land Services Ltd.
Type de contrat :
Somme stipulée
Taille du projet :
1 800 m².
Durée de l'enquête :
29 mois
Valeur du projet :
$22,400,000

The new facility features an ultra-filtration membrane process complete with distribution pumping and full facility back-up power system along with an attached operations and administration building. The majority of the work was self-performed using Bird’s in-house trades, including mechanical process, electrical, HVAC and plumbing, instrumentation, PLC programming and carpentry. The building design for the new treatment plant consists of many sustainable features, such as a green roof system, solar photovoltaic array, and an HVAC system that uses a solar wall for outside air pre-heating and a heat exchanger on the raw water piping for building cooling.
Un aspect important du projet était la transition en douceur entre le système existant et le nouveau. L'équipe a travaillé en étroite collaboration avec le consultant en conception et Drayton Valley pour s'assurer que le nouveau processus de traitement soit mis en service sans avoir d'impact sur l'approvisionnement en eau de la communauté. Un plan détaillé de mise en service et de communication pour les habitants de Drayton Valley a été un élément essentiel de la transition réussie de la communauté concernée vers le nouveau système d'approvisionnement en eau.