The Berczy is a lavish collection of 166 condominium units in a terraced 13-storey residential property located in Toronto's fashionable St. Lawrence neighbourhood.
Located at the corner of Scott and Wellington, this soaring contemporary tower rises 58-storeys. This development created a bold vision for an exceptional new landmark condominium in one of the city’s premier downtown locations.
The fitness facility at the Canadian Forces Base in Shilo required a renovation and addition to support its members, which included new offices, storage areas, and fitness facilities.
The Department of National Defence Area Support Unit (ASU) London supports 2,800 reservists, 5,000 cadets and 300 cadet instructors located throughout southwestern Ontario.
Due to the increase of construction activities in the area, there was a growing demand for potable water consumption in construction camps.
The new MacKenzie pump house and reservoir facility has increased the storage capacity of the MacKenzie reservoir to 14,750 cubic metres and the pumping capacity to 500 litres per second.
As a model for more sustainable designs in the Northern Alberta region, the Northern Sunrise County water treatment plant is the region's first LEED® silver plant.
To accommodate the increasing population in the Regional Municipality of Wood Buffalo, Bird bid and secured all four phases to upgrade the municipality's water treatment plant.
The plant is able to produce 18 million litres of fresh water per day — more than doubling the previous capacity.
The high voltage test facility for Manitoba Hydro is one of only three high voltage test facilities in Canada capable of assessing 550-kilovolt alternating and 500-kilowatt direct current equipment.