The Berczy is a lavish collection of 166 condominium units in a terraced 13-storey residential property located in Toronto's fashionable St. Lawrence neighbourhood.
Located at the corner of Scott and Wellington, this soaring contemporary tower rises 58-storeys. This development created a bold vision for an exceptional new landmark condominium in one of the city’s premier downtown locations.
The fitness facility at the Canadian Forces Base in Shilo required a renovation and addition to support its members, which included new offices, storage areas, and fitness facilities.
The Department of National Defence Area Support Unit (ASU) London supports 2,800 reservists, 5,000 cadets and 300 cadet instructors located throughout southwestern Ontario.
Due to the increase of construction activities in the area, there was a growing demand for potable water consumption in construction camps.
The new MacKenzie pump house and reservoir facility has increased the storage capacity of the MacKenzie reservoir to 14,750 cubic metres and the pumping capacity to 500 litres per second.
To accommodate the increasing population in the Regional Municipality of Wood Buffalo, Bird bid and secured all four phases to upgrade the municipality's water treatment plant.
The plant is able to produce 18 million litres of fresh water per day — more than doubling the previous capacity.
Bird provided pre-construction services and completed all civil works including the installation of underground utilities and a large precast concrete sump.
Bird Heavy Civil Ltd. completed the residue storage area and dams project at Vale's Long Harbour Nickel Processing Plant, which included three earth-filled dams encapsulating the residue storage area.