Bird, in partnership with EPCOR and Ontario Power Generation (OPG), successfully delivered the new Darlington Water Treatment Plant—a critical infrastructure project ensuring a reliable supply of pharmaceutical-quality demineralized water to OPG’s nuclear steam systems for the next 30 years. This 2,800 sq. m. facility, located at the secure Darlington Nuclear Generating Station, was strategically designed and built outside the protected area, allowing operations to continue uninterrupted at the existing plant.
Intended to house the 36 Service Battalion, 36 Signal Regiment and 33 Field Ambulance, The Princess Louise Fusiliers and The Halifax Rifles reserve units; The Willow Park Armoury is made up of a broad range of spaces including a drill hall, classrooms, offices, vehicle maintenance bays, training simulators, small arms trainer, weapons storage, and associated support spaces.
The Stadacona Drill Shed, located in Halifax, Nova Scotia, is a state-of-the-art facility designed to consolidate the Seamanship Division training and Drill Shed activities. This new 102,000 sq. ft. facility includes offices, classrooms, training spaces, and a large drill hall. The facility is divided into three distinct zones: a naval boarding training area dedicated to specialized training and simulators for naval boarding operations, a ceremonial drill hall section designed for ceremonial drills and other large-scale activities, and an instructional/office zone that includes classrooms and office spaces for instructional purposes and administrative work.
New industrial scale insect production facility constructed within an existing industrial warehouse.
This processing facility is the first facility of its scope, size and complexity. It includes a processing plant, warehouse, office space, and its own electrical substation. The processing facility will derive protein from both canola and peas.
The new facility includes a single NHL-sized ice surface with more than 9,000 permanent seats and a reconfiguration design of 10,000 seats to accommodate other events.
Due to the rapid and continued growth in the RCMP E Division headquarters' operations, Bird has constructed a consolidated headquarters - the largest RCMP Division headquarters in the country.
The new facility provides maintenance, repair, and additional storage for the local rail transit system's (GO Transit) planned service expansion.