The addition to the heavy vehicle shop added an additional four service bays for servicing the 340-ton trucks. The addition included two new overhead 40-ton bridge cranes. The last phase of this expansion added space for an additional 600 lockers to the existing mine dry area. The complete Steepbank facility remained in full operation throughout the construction process, providing additional challenges overcome by the Bird team throughout the construction period.