Tenders & Bids - Buildings
The Zone Office relied extensively on exposed structural steel and concrete finishes and the Parts Distribution Warehouse was constructed utilizing tilt-up concrete panels, steel framing and storefront glazing. Also included in project is a 140 stall parking lot, access truck road, industrial kitchen and a two tier small parts racking system.
Back to projects