The Borealis Lodge Accommodation Complex is a 1,500-suite camp facility adjacent to a Suncor Energy Inc. oilsands development.
List Title : Borealis Lodge
Page title : Borealis Lodge Accommodation Complex
Detailed location : FORT MCMURRAY, ALBERTA
Client : Beaver Foods, a division of Cara Foods Ltd.
Consultant : Barr Ryder Architects and Planners
Contract type : Construction Management
Project value : Undisclosed
Project size : 35,000 sq. m<br>(376,400 sq. ft)
Duration : 12 months
Award :
Lead certification level :
Featured : No

Bird successfully managed 78 trade contractors within the rigid industrial plant safety and quality standards. The facility is comprised of 15 interconnected three-storey accommodation wings and a centralized core building complex with recreational facilities, kitchen, and a dining area capable of seating 1,000 occupants.

Built for permanent long-term use, the facilities are structural steel-framed on driven pile foundations with concrete floor slabs. The major challenge of the project was the complete design and construction through a short schedule and tight budget. All work was simultaneously designed and constructed along with a complete infrastructure that included roadways, utilities, a two-million litre water reservoir, and wastewater treatment plant.

Delivery Model : Construction Management
Services :
  • Pre-Construction/Early Contractor Involvement
Markets :
  • Industrial Buildings
  • Petrochemical
  • Waste & Wastewater
  • Workforce Housing
Location : Alberta
Sector : Oil and Gas
Borealis Lodge Accommodation Complex interior showing seating area Large Atrium with Bench Seating and Glazed Skylight