Chevron Summer Pipeline

Nov 13, 2020, 14:00 PM
Bird installed approximately 22 kilometres of four-inch flex pipe pipeline for sour gas transport and three-inch flex pipe pipeline for produced water.
List Title : Chevron Summer Pipeline
Page title : Chevron Summer Pipeline
Detailed location : Fox Creek, Alberta
Client : Chevron Canada
Consultant : Undisclosed
Contract type : Undisclosed
Project value : $4,000,000
Project size : 22 km
Duration : 7 months
Award :
Lead certification level :
Featured : No
Bird was responsible for the installation of approximately 22 kilometres of four-inch flex pipe pipeline for sour gas transport and three-inch flex pipe pipeline for produced water, along with associated risers and tie-ins. Horizontal directional drilling sleeves were high density polyethylene pipe and were fused on site.

The scope of work included clearing/grubbing, horizontal directional drilling for crossings, and the installation of pipeline segments using the plowing method and conventional open-cut. The plowed section of pipeline was completed utilizing a specialized plow and winch that plowed the pipe in place with a single pass in lieu of an open-cut excavation.

The utilization of the cutting-edge innovative trenching solutions technology reduced the project duration, as well as ensured a significantly smaller construction footprint, better depth consistency and more stability than traditional trenching and excavation methods.
Delivery Model : General Contracting
Services :
  • Self-Perform: Process
Markets :
  • Midstream
Location : Alberta
Sector : Oil and Gas