The Consumers Co-operative Refineries Ltd. Control Operations Centre was built within the blast zone of an active plant with pre-cast walls.
List Title : Consumers Control Operations Centre
Page title : Consumers Co-operative Refineries Ltd. Control Operations Centre
Detailed location : REGINA, SASKATCHEWAN
Client : Consumers Co-operative Refineries LTD.
Consultant : LAG Global Projects ULC & Stantec Inc.
Contract type : Stipulated Sum
Project value : $9,250,000
Project size : 16,400 sq. ft.
Duration : 24 Months
Award :
Lead certification level :
Featured : No

Bird constructed a 16,000 square foot control room on a structural slab foundation with precast walls and double-tee roof, structural steel studs and masonry partitions.

Located within the blast zone of an active plant, Bird used precast panels measuring 14.5 inches thick. To assemble the building the main access to the plant was shutdown and a secondary access was used to control workflow. Daily meetings ensured coordination was streamlined during the erection of the pre-cast walls and roof. Bird synchronized deliveries of the precast panels and assembled each of the panels at site using a 270-ton crane. The synchronized deliveries allowed Bird to adhere to its schedule while maintaining uninterrupted site operations.

Delivery Model : General Contracting
Services :
Markets :
  • Industrial Buildings
  • Petrochemical
  • Process/Non-Process Buildings
Location : Saskatchewan
Sector : Oil and Gas
Aerial view of Consumers Co-operative Refineries Ltd. Control Operations Centre construction site