Kirby In-Situ SAGD Buildings
Feb 20, 2020, 03:54 AM
Located on the Kirby In-Situ Oilsands Project, Bird is constructing three industrial buildings for oil treatment, water treatment, and steam generation.
List Title :
Kirby In-Situ SAGD Buildings
Page title :
Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
Detailed location :
FORT MCMURRAY, ALBERTA
Client :
Canadian Natural Resources Limited
Consultant :
Dynawest Engineering LTD.
Contract type :
Design-Build
Project value :
$15,000,000
Project size :
83,300 sq. ft.
Duration :
14 Months
Award :
CNRL Appreciation of Safety Excellence Award
Lead certification level :
Featured :
No
Bird was awarded a design-build contract for three industrial buildings: a 28,100 square foot oil treatment building, a 15,200 square foot water treatment building and a 40,000 square foot steam generation building.
These new buildings house process equipment for the Canadian Natural Resources Limited Kirby Lake In-Situ project. All three buildings are pre-engineered steel structures with a combination of foam panel and conventional cladding. One of the most challenging aspect of the project was erecting these building around existing and operating equipment.
[[Auto Insert Gallery here]]
Delivery Model :
Design-Build/Engineering, Procurement, Construction
Services :
- Pre-Construction/Early Contractor Involvement
Markets :
- Industrial Buildings
- Petrochemical
- Process/Non-Process Buildings
Location :
Alberta
Sector :
Oil and Gas