Bird Heavy Civil is completing work at one of the main mining pits in the ArcelorMittal mine, Paul's Peak.
List Title : Paul's Peak Waste Rock Project
Page title : Paul's Peak Waste Rock Project
Detailed location : Mt. Wright, Quebec
Client : ArcelorMittal Mines Canada
Consultant : SNC-Lavalin
Contract type : Unit Price
Project value : $100,000,000
Project size : 39M tons of waste rock<br />2M tons of overburden
Duration : 36 months
Award :
Lead certification level :
Featured : Yes

A large fault - a fracture in the rock resulting from earth movement - was detected on the upper portion of the exposed face, which could pose a risk to mining operations below. Consequently, approximately 40 million tons of material has to be removed from the wall to deal with the safety issue and to permit access to additional ore. The biggest challenge thus far has been HJO's ability to work within the blasting constraints and produce material that is sufficiently fractured and heaved to permit efficient excavation operations. Furthermore, different rock varieties have reacted differently to the drill and blast designs. By adjusting drilling patterns, powder factors and drill hole blasting sequence, the team has been able to achieve more efficient excavation operations.