The Suncor Firebag 3 administration buildings is a unique project that locates the administration and control buildings in a remote site and are the first LEED certified buildings designed and constructed in the oilsands.
List Title :
Suncor Firebag Buildings
Page title :
Suncor Firebag 3 Administration Buildings
Detailed location :
FORT MCMURRAY, ALBERTA
Client :
Suncor Energy Services Inc.
Consultant :
Stantec
Contract type :
Design-Build
Project value :
Undisclosed
Project size :
16,258 sq. m<br>(175,000 sq. ft)
Duration :
24 months
Award :
Lead certification level :
CERTIFIED
Featured :
No
The administration complex project consists of seven buildings totalling 16,258 square metres including site services, granular paving, and landscaping. The main buildings are a two-storey administration building, and a control and locker facility. The site also includes a 5,800-square-metre maintenance warehouse building and four satellite buildings comprised of a vehicle repair shop, a heavy welding shop, a chemical storage and a chemical lab building.
The team was responsible for the design, supply, and installation of the natural gas, sanitary, domestic water and fire water services, as well as two lift stations to ensure suitable water capacity.
[[Auto Insert Gallery here]]
Delivery Model :
Design-Build/Engineering, Procurement, Construction
Services :
- LEED/Sustainable Construction
- Pre-Construction/Early Contractor Involvement
Markets :
- Industrial Buildings
- Petrochemical
- Process/Non-Process Buildings
Location :
Alberta
Sector :
Oil and Gas