As the contractor for the original mine services complex at Suncor's Steepbank Mine, Bird was subsequently awarded the contract to expand the wash bay, heavy vehicle maintenance shop, and the mine dry area.
List Title : Suncor Steepbank Mine Complex Expansion
Page title : Suncor Steepbank Mine Complex Expansion
Detailed location : FORT MCMURRAY, ALBERTA
Client : Suncor Energy Inc.
Consultant : SNC-Lavalin
Contract type : Design-Build
Project value : Undisclosed
Project size : 2,970 sq. m<br>(32,000 sq. ft)
Duration : 8 months
Award :
Lead certification level :
Featured : No

The expansion added one additional wash bay to the existing building. This required a retrofit of the existing mechanical room to accommodate the expansion. The new wash bay is equipped with 12 high pressure water cannons and incorporated three separate sump pits.

The addition to the heavy vehicle shop added an additional four service bays for servicing the 340-ton trucks. The addition included two new overhead 40-ton bridge cranes. The last phase of this expansion added space for an additional 600 lockers to the existing mine dry area. The complete Steepbank facility remained in full operation throughout the construction process, providing additional challenges overcome by the Bird team throughout the construction period.

Delivery Model : Design-Build/Engineering, Procurement, Construction
Services :
  • Pre-Construction/Early Contractor Involvement
Markets :
  • Industrial Buildings
  • Mine Infrastructure Development
  • Petrochemical