Wabagishik Spillway Replacement Project

Dec 17, 2020, 15:19 PM
Located approximately 45km east of Sudbury, Ontario is a manually operated water control structure that is over 100 years old, nearing the end of its lifecycle. To remedy this, the team is acting as constructor and building a new and remotely operated spillway which will exceed current dam safety requirements and will have the ability to manage a one in 100-year flood.
List Title : Wabagishik Spillway Replacement Project
Page title : Wabagishik Spillway Replacement Project
Detailed location : Sudbury, Ontario
Client : Vale Canada Limited
Consultant : Undisclosed
Contract type : Lump Sum
Project value : $25,926,825
Project size : Undisclosed
Duration : 36 Months
Award :
Lead certification level :
Featured : No
Located approximately 45 km east of Sudbury, Ontario is a manually operated water control structure that is over 100 years old, nearing the end of its lifecycle. To remedy this, the team is acting as constructor and building a new and remotely operated spillway which will exceed current dam safety requirements and will have the ability to manage a one in 100-year flood. 
The scope of the project includes substantial mechanical, electrical, civil and structural works such as the design and installation of the spillway structure, hoist control building and electrical system. The fully automated and remotely controlled spillway will include four new sluiceway gates, full supervisory control and data acquisition (SCADA), and independent emergency back-up generation in the event of a loss in power. 
 


Delivery Model : Design-Build/Engineering, Procurement, Construction
Services :
  • Self-Perform: Process
Markets :
  • Civil
  • Electrical & Instrumentation
  • Hydro
  • Mechanical
  • Power
Location : Ontario
Sector : Power