Feb 20, 2020, 03:53 AM
Two consecutive design-build contracts were awarded to Bird to expand and renovate the existing Petrie Science & Engineering Building for York University.
List Title : York University Research Facility
Page title : York University Petrie Science and Engineering Building
Detailed location : TORONTO, ONTARIO
Client : YORK UNIVERSITY
Consultant : NORR LIMITED
Contract type : DESIGN-BUILD
Project value : $6,900,000
Project size : 18,800 SQ. FT.
Duration : 15 MONTHS
Award :
Lead certification level :
Featured : No

The partial floor addition to the Gordon G. Shepherd Atmospheric Research facility was built on the roof of the existing Petrie building despite the fact that the building was never designed to be expanded vertically. Bird constructed a separate frame to support the extension by connecting it to Petrie’s existing structure using column stubs and cross beams. In addition, the building materials had to be lifted by crane and construction had to be completed before classes began.

With the success of the first contract, another a second contract was awarded to Bird to complete the floor addition to accommodate all-season research. The observatory was segregated into two rooms; one which is insulated was constructed so that the roof observatory hatches can be left open during the most frigid winter weather.

Delivery Model : Design-Build/Engineering, Procurement, Construction
Services :
  • Pre-Construction/Early Contractor Involvement
Markets :
  • Education
  • Research
Location : Ontario
Sector : Buildings
Elevated view of York University building showing different exterior finishes Exterior detail of York University Research Facility showing brick clad tower and windows